My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_THIRD QUARTER 2014 GROUNDWATER MONITORING REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2900 - Site Mitigation Program
>
PR0524672
>
ARCHIVED REPORTS_THIRD QUARTER 2014 GROUNDWATER MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 2:50:05 PM
Creation date
2/6/2020 8:39:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
THIRD QUARTER 2014 GROUNDWATER MONITORING REPORT
RECORD_ID
PR0524672
PE
2965
FACILITY_ID
FA0016571
FACILITY_NAME
DEUEL VOCATIONAL INSTITUTE
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
953049518
APN
23912001
CURRENT_STATUS
01
SITE_LOCATION
23500 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
URS <br /> Mr. Durin Linderholm Page 2 of 10 <br /> Regional Water Quality Control Board—Central Valley Region <br /> ' October 30, 2014 <br /> ' Groundwater monitoring wells were installed to assess the extent of groundwater impacts. Monitoring <br /> wells MW-1-BP, MW-2-BP, and MW-3-BP were installed in 1987. Monitoring wells MW-4-BP <br /> through MW-10-BP were installed in 1988. Monitoring wells MW-11-BP through MW-15-BP were <br /> installed in 1994. Monitoring wells MW-16-BP through MW-18-BP were installed in 1995. Monitoring <br /> wells MW-1-BP, MW-5-BP, MW-6-BP, and MW-9-BP are used to monitor petroleum and chlorinated <br /> solvent-impacted groundwater at the site on a quarterly basis. <br /> ' In 2003, the Regional Water Quality Control Board issued Cease and Desist Order No. R5-2003-0066 <br /> to DVI for exceeding stormwater discharge effluence limits, most notably for chlorinated solvents. Part <br /> ' of the order required the repair of broken storm drain pipelines identified previously as receiving <br /> infiltration of impacted groundwater. Emergency repair of the storm drain pipes was conducted in 2004. <br /> Sewer pipe rehabilitation was completed by January 2005. <br /> ' A groundwater remediation system was installed in accordance with URS' Operation and Maintenance <br /> Manual Addendum, dated June 9, 2005. The system utilizes a groundwater pump installed in well <br /> MW-6, two liquid-phase granular-activated carbon vessels, a holding tank, and a sprinkler discharge <br /> ' system. The system was installed and started on August 4, 2005. The groundwater treatment system was <br /> shut off for the winter in October 2005. The system was restarted in early April 2007, and operated for <br /> 4 months. <br /> ' On November 16 and 17, 2004, URS drilled and installed five 2-inch-diameter groundwater monitoring <br /> wells (MW-19-BP through MW-23-BP) adjacent to the sewage treatment plant ponds. These wells are <br /> ' used to monitor potential groundwater quality impacts related to the sewage treatment plant ponds. <br /> On March 27, 2008, groundwater monitoring well MW-11 was decommissioned (destroyed) to make <br /> way for the new sewage treatment plant. <br /> Monitoring wells MW-I-STP through MW-4-STP, from the sewage treatment plant, and MW-19-SP <br /> through MW-24-SP, from the sewage ponds, are now used as part of the burn pit investigation. <br /> ' On March 30, 2011, URS drilled and installed two groundwater monitoring wells (MW-24-BP and <br /> MW-25-BP), to serve as transition wells for the emulsified oil substrate(EOS)pilot test. <br /> ' On April 19, 2011, groundwater monitoring well MW-23-SP was destroyed due to previous damage. <br /> URS drilled and installed MW-23R-SP at approximately 10 feet from the original well location. <br /> ' In April 2011, URS completed pilot test activities. Thirty injection point locations were installed from <br /> south of monitoring well MW-6-BP, located in the former burn pit, to south of MW-5-BP. At each <br /> injection location, approximately 165 gallons of EOS-diluted solution (at a 10-to-1 ratio of potable <br /> water to EOS) was injected into the subsurface from approximately 7 to 23 feet below ground surface <br /> (bgs) (Figure 5). After completing the EOS injections, the injection borings were destroyed using <br /> bentonite slurry. <br /> 1 <br /> OSACDATA01\DisCzPIIuc6\Wpmcass\CDCR\Dmel VOCadums IIsum0un(Bum PWDVI-BP-3QA 14 Rc m.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.