Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO. -13- <br /> RODNEY AND GAYLA SCHATZ <br /> MOKELUMNE RIM VINEYARDS <br /> SAN JOAQUIN COUNTY <br /> Plan shall be kept at the facility for reference by operating personnel and they shall be <br /> familiar with its contents. <br /> e. By 15 September 2004, the Discharger shall submit a Groundwater Well Installation <br /> Report of Results that contains the information in Section 3 of Attachment D. <br /> f. By 5 April 2004, the Discharger shall submit and implement a workplan for a Salinity <br /> Reduction Study. The study shall look at all aspects of winery waste and shall <br /> investigate methods to reduce the concentration of dissolved solids in the wastewater. <br /> At a minimum, the salinity reduction report shall include a discussion of the <br /> winemaking chemicals, cleaning and sterilization procedures, vineyard practices, and <br /> salinity monitoring. <br /> a. By 15 December 2005, the Discharger shall submit a Background Groundwater <br /> Quality Study Report. For each groundwater monitoring parameter/constituent <br /> identified in the MRP, the report shall present a summary of monitoring data, <br /> calculation of the concentration in background monitoring wells, and a comparison of <br /> background groundwater quality to that in wells used to monitor the pond and land <br /> application areas. Determination of background quality shall be made using the <br /> methods described in Title 27, Section 20415(e)(10), or equivalent, and shall be based <br /> on data from at least four consecutive quarterly(or more frequent) groundwater <br /> monitoring events. For each monitoring parameter/constituent, the report shall <br /> compare measured concentrations for compliance monitoring wells with the calculated <br /> background concentration. <br /> If the Background Groundwater Quality Study Report shows that the wastewater <br /> discharge has impacted, or is likely to impact groundwater quality, then upon request <br /> by the Executive Officer the Discharger shall submit Groundwater Mitigation Plan <br /> which shall evaluate contaminant control alternatives, describe a preferred alternative, <br /> and proposed a timeline to meet the Groundwater Limitations of this Order. The <br /> selected contaminant control alternative must comply with State Water Resources <br /> Control Board Resolution No. 68-16 and be consistent with the most recent Basin <br /> Plan. <br /> 3. The Discharger shall comply with the Monitoring and Reporting Program No. , <br /> which is part of this Order, and any revisions thereto as ordered by the Executive Officer. <br /> 4. The Discharger shall comply with the "Standard Provisions and Reporting Requirements for <br /> Waste Discharge Requirements", dated 1 March 1991, which are attached hereto and by <br /> reference a part of this Order. This attachment and its individual paragraphs are commonly <br /> referenced as "Standard Provision(s)." <br /> 5. In the event of any change in control or ownership of land or waste discharge facilities <br /> described herein, the Discharger shall notify the succeeding owner or operator of the <br /> existence of this Order by letter, a copy of which shall be immediately forwarded to this <br /> office. <br /> V:Sai�loaqum Nonli\Su11t06rirnTSm JonquimM1fokelunmc Rim Vi-yuds\WDMA. <br />