Laserfiche WebLink
' March 23,2006 <br /> NOA PROJECT NUMBER E05131A <br /> ' 4.4 Proposed Analytical for the Second Quarter 2006 Quarterly Monitoring Event <br /> NOA will conduct the second quarter monitoring event during the end of the second quarter Qune). <br /> ' The three existing monitoring wells will be sampled and analyzed per the following schedule: <br /> MW-1 -Routine Water Quality and Standard Minerals <br /> ' MW-2 - Routine Water Quality and Standard Minerals <br /> MW-3 - Routine Water Quality and Standard Minerals <br /> ' 5.0 LIMITATIONS <br /> Our professional services were performed,our findings obtained,and our recommendations proposed <br /> in accordance with generally accepted geologic and engineering principles and practices.This warranty <br /> ' is in lieu of all other warranties either expressed or implied. Test findings and statements of professional <br /> opinion do not constitute a guarantee or warranty, expressed or implied. This report contains <br /> information and data provided to NOA by several sources. NOA in no way warrants the accuracy or <br /> completeness of the information provided to this investigation by those sources. <br /> This report or any part thereof may not be reproduced in any form without written permission from <br /> NOA,its Principals, or agents. <br /> ' 6.0 SIGNATURES OF ENVIRONMENTAL PROFESSIONALS <br /> Neil O. Anderson and Associates �OQRpFESS <br /> p.Roe/ <br /> G� <br /> JAMES D.LU <br /> (� <br /> ' No.C69 45 X i ROBINSON <br /> Exp. <br /> �� No 7834 <br /> � �' <br /> Ja es D. Robinson,Project Manager cPj CiviO. <br /> ' PG - 7834,RCE - 690459TFOF CAUF�� T�OF <br /> CA1-�FOQ` <br /> C: Randall Lange,LangeTwins Wine Estates <br /> Harlin Knoll,R.E.H.S., EHD <br /> 9 "044 <br />