Laserfiche WebLink
ENVIR Page 13 ENVIR Page 14 <br /> March -DlI �020-03-0]ch Ol <br /> A59ESSMENT, PC Project Number 2020-0-03-011 ESSMENT, PC Project Numb <br /> activities will be continued until field parameters (pH, electrical conductivity, and temperature) • General Information <br /> have stabilized and purged water is visually sediment-free. • Drilling Details <br /> • Well Construction Details <br /> Equipment Decontamination/Waste Management <br /> All augers and sampling tools wed for sample collection will be thoroughly rinsed with clean water • Well Development: <br /> after being washed with a solution of Alconox.All down-hole drilling equipment will be pressure • Well Survey _ <br /> washed prior to starting each boring. Cuttings and rinseate generated during drilling will be dis- In addition,the results ofthe first sampling event will be included in this report. <br /> posed of at the site. 5. PROFESSIONAL SIGNATURE <br /> Monitoring Well Survey <br /> Shoup Land Surveying(Licensed Land Surveyor)or equivalently licensed surveyor will be con- Enviro Assessment has prepared this report to present our professional opinion as to the site <br /> tmcted with to survey the new monitoring wells(both vertical and horizontal). Vertical elevations characteristics that affect the proposed changes to the Original Order. <br /> for the wells are in be surveyed at three points:(1)the top ofthe monitoring well vault:(2)the top <br /> of the well casing or surrounding port;and(3)the ground surface.Vertical elevations for the bor- [thus been a pleasure to be of service. Ifany questions arise,please contact our office. <br /> ings are to be surveyed at the ground surface.Elevations surveyed are to the nearest hundredth of Sincerely, <br /> a foot referenced to NAVD 88 datum.The horizontal locations of each well we the center points EN RfOAS ESSMENT,PC <br /> and are surveyed to the nearest tenth of a foot referenced in NAD 83 datum.A site plan showing <br /> certain site features including the monitoring wells,soil borings,etc.is also generated and included <br /> as part ofthe final report <br /> James D.Robimson46 <br /> Schedule for Completion of Work RE 69045,C.E.G.2441,P.G.7834 r �� r T <br /> MonitoringWell Drilling is anticipated to occur 3 weeks after notice of the work Ian approval. <br /> g � Pa P PP a'o.C6 6 ✓ - <br /> C-PTIF ;1 7r <br /> The development will occur at least 48 hours after completion ofthe monitoring wells. The first �.">r Ice =q;N:�,r t.^ Exp O <br /> EOL GiSr �. `0 `J sampling would occur one week later. The expected drilling would occur in April or May,2020 `�FC ,F" gTFop�l <br /> with the first sampling in May 2020. <br /> 4. MONITORING WELL INSTALLATION REPORT <br /> A Monitoring Well Installation Report and Report of Groundwater Sampling Analysis will be <br /> produced after the completion of the monitoring wells and the first sampling event. The report <br /> will include the following topics in detail: <br /> aTNIROAa8ES5N.GNI,PC ENVIRONMENTAL ENOMER510 OEOLWY ENVIROA886sSM1@N'r.PC ENVLCONMENIAL ENGWEERINn GEOLOGY <br /> COaP.PoaO%1154,➢ONNF]iS FERItY.ID8J805 PHONa(844))42-Y511 FA%(Bl1)6ll3493 CORP:FOBXX1154.BONNERSFERRY,m83805 MOM044)7451311 1AX(9TI)6n.U93 <br />