Laserfiche WebLink
ENVIR Page ENVIR Page <br /> 2020 <br /> ESSMENT, PC <br /> Project Number 202003-01ch ll ESSM ENT, PC Project Number Match200301/1 <br /> Equipment to be Used During Sampling <br /> Jahant Wood Cellars,LP <br /> 1525 East Jahant Road The basic equipment to be used for ground water sampling includes the following: <br /> Acampo,California 95258 <br /> 1. Gloves and other protective clothing <br /> Subject: Sampling and Analysis Plan For 2. Disposable bailer and string;preferred method of sample collection _ <br /> Langetwins Family Winery and Vineyards 3. Submergible sample pump if needed <br /> 1525 East Jahant Road 4. Sample bottles and labels J <br /> Acampo,California 95248 5. disposable towels <br /> 6. pH,TDS,conductivity,and temperature meter <br /> 7. Field notebook pencil,chain of custody form <br /> 8. Ice chest and ice <br /> Langetwins Family Winery and Vineyards: 9. Liquid-Nos Detergent and distilled water <br /> As requested,Enviro Assessment,PC(Enviro Assessment)has prepared a Sampling and Analysis 10. Electric water level meter(sounder),0.01 foot accuracy <br /> 11. Two(2)graduated five-gallon buckets <br /> Plan for 1525 East Jaham Road,Acampo,California.The subject property is the site of a winery, <br /> wastewater ponds,and land application area The Facility is requesting to change its discharge area Equipment Decontamination Procedure <br /> and discharge limits. The SAP has been prepared by a California Certified Engineering Geologist <br /> as required by the Board.The SAP presented herein has been adapted from an outline of a guidance Disposable bailers will be utilized to collect water samples from the monitoring wells. <br /> document provided by the Board. The plan will be referred to by individuals responsible for Should the disposable bailer not be effective,a submergible sample pump may be utilized. De- <br /> conducting ground water monitoring and sampling activities. contamination of the pump will involve flushing and washing with a solution of potable water and <br /> Liquid-Nos solution(or equivalent),followed by rinsing with distilled water. <br /> 1. SAMPLING AND ANALYSIS PLAN The electric well sounder will be decontaminated prior to each measurement event with a <br /> solution of potable water and Liquid-Nos detergent or equivalent followed by rinsing with dis- <br /> The SAP is organized into the following sections;equipment to be used,decontamination prom- tilled ware¢ <br /> dures, water level measurement procedures, purging prior to sample collation, monitoring and <br /> record keeping,purge water disposal,analytical methods and reporting limits, sample containers Purging Prior to Sample Collection ---�• <br /> and preservatives,sampling,chain of custody,and sample handling and transport. <br /> Three(3)wetted casing volumes will be purged prior to sampling. One(1)wetted casing <br /> A California licensed geologist or engineer will oversee the sampling of the ground water moni- volume in a 2-inch diameter well with 15 feet of wetted casing is about 2.5 gallons. <br /> toting wells at Langetwins Winery to be consistent with the workplan presented herein, Enviro <br /> Assessment,PC will not proceed with sampling of ground water monitoring wells until they re- Should the ground water drop below the depth of the well,sampling may not be possible <br /> ceive written approval from the Board. at that time. <br /> EMIIROA55E53NRM.PC E14vlk M19?rr ENGWEERWG-GEOLOGY ENVBtOAE5E5SFIDJf.PC FIJVIRONMENM ENGWEF.RPIO Mornay <br /> CORP:PO WX 1154.BOMrEita FERRY.m$39a5 MOMEW)742-]311 ?M(ar7)6ll-R93 CORP.PoBOC 1154.aONNEREF£a.RY.a3638°5 MONE")74_-7311 FA%ta73)M-R" <br />