Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> -1865 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www,sigov.or[I/ehd <br /> UNDERGROUND STORAGE TANK(UST) PROGRAM INSPECTION REPORT CONTINUED <br /> Facility Facility Inspcdlon <br /> Name: 99 Shell Address; 7700 Moreland Street, Stockton pate. Aug 29, 2013 <br /> VIOLATIONS <br /> # G1 C2 M God.S.eti.n I ICC-CA I IeARI-i a-u 3erat Cuder CFR=CDda of Feder?I KC ulations <br /> C1=Glass 1 violatlan C2.=Class 2 violatlon:M=Minor violatlan <br /> F!t <br /> 702 CCR 24".e) biennial tightnecc tnJ.?of ry.may piping not porforrned(pro January 1,1084) (M1) <br /> 703 CCR 2643(d) Triennial line test for conventional suction piping not performed(pre-January 1, 1984) (M 1). <br /> 999 Other., Sac attached"COntinuation...Oftioial InsNcctiun Report'for violations)not listed above. <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I, CLASS Il,or_MINOR-Notico to Comply) <br /> Routine and Monitoring System Certification UST inspection <br /> O <br /> 403, 404. The 87 turbine sump lid metal clamp is broken and needs replacement.�clamp of <br /> the system which prevents water intrusion into the sump and gasoline vapors from escaping the sump_ <br /> Immediately replace the clamp. Submit a corrective action statement to the Environmental Health <br /> Department ( HD) by September 29, 2013, <br /> 403, 406. The dispenser 1/2, 3/4 and 5/6 annular sensors were I arm during and after the inspection <br /> since the interstitial space has leaks and will not hold the interstitial fluid. The sensors_monitoring the_ <br /> liquid leve in t e interstitial space shall be maintained so that a breach in therima or secondary <br /> ,Gqnta -int is detP tPd,befo he ha ar ous su st n� cA is_r eas d 'nto t c,,e� pn <br /> wt� <br /> ��ej <br /> 1��+tip- "' .-cin nfacility <br /> The facility ow er I as applied for a r Tit, SR0067629, to make the dispe ser su <br /> permit was ap roved August 5, 2013. Have the repair work started as as possible. <br /> in violation unt I the repairs are complete and insperted by the F Ho. <br /> Note <br /> 1. <br /> �� Irti S • �a,.�- �I <br /> 1. Complete and submit a copy of the Return to Compliance Certification form with a statement of how <br /> each viola Ion was corrected, including supporting documentation, by September 29, 2013. <br /> ALL LKV 5TAF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATE$WILL BE BILLED AT THE CURRENT HOURLY RATE, <br /> THIS FACILITY IS SUBJECT TO REINSPECTION ATA 1ME AT END'S CURRENT HOURLY RATE. <br /> it:pact�1 geceive�By: 'itlw: <br /> I ' <br /> Rav 04/19/12 C� Page 3 UST INSPECTION R,?ORT <br />