My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 3:35:59 PM
Creation date
2/6/2020 8:58:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Multi-Sync Installation Instructions <br /> D7P - M1.1111i For Blueline Small Fittings <br /> D17 This kit provides the Multi-Sync Repair for applications where the pipe is coming-thrutilhe <br /> rur�QWcAxxnr sump wall straight or at an angle. <br /> WARNING.Prepare all surfaces to he honded priorto completing installationsteps below. <br /> Afl SZ BLS-1.1 Failure to followeach step will void warranty&may result in prematurefailure of penetra tionjitfi-iDy. <br /> Page 1 This Kit applies for repairing:Blueline Small Fittin&s <br /> General Instructions for: CLEANING:Spray all surfaces to be bonded with DBC Cleaner and allow to air dry or wipe excess with a cle an do q <br /> cloth. Surfaces must be dry before applying bonder. <br /> STEP 1: Remove Old Boot STEP Z: Clean all Repair Components STEP 3: Place&Dry Fit Insert&Sleeve <br /> • Remove clamps Clean all repair components with DBC Place the split cuff insert over the pipe and test fifilWo <br /> • Cut away old boot prior to installation inside of the existing fitting cuff. <br /> • Clean&sand fitting Place the split sleeve over the pipe&up to the cutJl with <br /> Split Cleaner Split the fill port up <br /> Cuff Sleeve 9 <br /> Insert <br /> nao <br /> A r <br /> Eccentric Insert Multi-Sync <br /> a.: Reducer z <br /> If everything fits continue STEP 5: Install The Sleeve STEP 6:Install&Bond Eccentric Insert&Multi-Syme <br /> • Apply DBB V to outside of cuff. Reducer Back Together <br /> with the install. If there is a Position the sleeve with the fill port at the top Wrack Eccentric Insert around the pipe <br /> problem with the fit& Once you have the sleeve lined up correctly, Wrack Multi-Sync Reducer around the pipe <br /> slide onto cuff Apply Zip Tite to split area on Eccentric Insert, pnws <br /> function of these parts,either ends together&clamp. <br /> adjust to make fit if possible, Apply Zip Tite to split area on Multi-Sync Reduce, <br /> or Call the factory(530:534- press ends together&clamp <br /> 3966) for additional help <br /> STEP 4: Bond Sleeve&Insert <br /> • Apply Zip Tite to split cuff insert. Use 1 of <br /> the clamps to hold in place while curing. <br /> • Apply Zip Tite to the split sleeve and use 2 <br /> clamps to hold in place while curing. <br /> • Leave these clamps in place for approx 30 <br /> minutes for curing before proceeding to <br /> the next step r <br /> r; <br /> Set the Clamp the around the sleeve&over the <br /> cuff and tighten"snugly". ill <br />
The URL can be used to link to this page
Your browser does not support the video tag.