My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 3:35:59 PM
Creation date
2/6/2020 8:58:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aug 29 13 11 : 54a Elite Contactors 12094616342 P. 6 <br /> MANDATORY <br /> C, <br /> 2 N. <br /> MA NDA TORY <br /> STEP 1 READ THIS ENTIRE MAN JAL FRONT TO <br /> BACK BEFORE BEGINNII JG INSTALLATION <br /> BEFORE BEGINNING WORK ON YOUR JOBSITE. YOU RUST EVALUATE THE <br /> EXISTING SUMPS, PIPE, CONDUIT AND FLEXIBLE ENT 1Y BOOTS YOU WILL <br /> BE RETROFITTING FOLLOW THESE RULES: <br /> A) Ensure the sump material is fiberglass only. <br /> B) Ensure the piping is fiberglass, galvanized steel or :IVC coated steel only. <br /> C) If the PVC coated conduit is Ocal-Blue brand, you iiust strip the PVC away <br /> from the fitting area and rough up the steel cor c .jit beneath. <br /> D) Ensure that the conduit has not rusted through. T i !.; fitting should not be <br /> bonded with any adhesive to a corroded or pauti Illy corroded conduit line. <br /> You must replace the corroded lines with new ,:-,( nduit first. <br /> DONE ❑ 1) Excavate to gain access to all fittings on each !m rnp. <br /> DONE ❑ 2) Remove any components that will obstruct acc,:! s to the fittings. <br /> DONE ❑ 3) Drain sump of any interstitial fluid and dispose I to not re-use. <br /> DONE ❑ 4) Clean interior and bottom of each sump. Remove contaminants, water and <br /> debris. Dispose of HAZMAT per local codes. <br /> DONE F-1 5) Ensure each sump will be completely dry durin.D nstallation. <br /> DONE ❑ 6) Secure all conduit lines by bracketing them to A least one rigidly connected <br /> conduit or the riser. Do not allow conduit endpi)i its to move or act as a lever. <br /> 7 ii-F-Series-Retrofit-SD-AB-1 3B <br />
The URL can be used to link to this page
Your browser does not support the video tag.