Laserfiche WebLink
Rug 29 13 11 : 56a Elite V Contactors 12094616342 p. 15 <br /> FINAL = STEP 9 <br /> 0- ) <br /> MANDATORY PRESSURE TESTING: 4 <br /> COMPLETE ❑ <br /> To test your complete fitting installation after a full adhesive cure time :)f 4 hours minimum at 75°F <br /> or greater, conduct a pressure/soap test on all fittings, inside and o0: ide at all critical joints. <br /> Bravo Systems DoubleWall Containment Sump: Maximum 4 PSI i 'id minimum 20"hg Vacuum. <br /> Other Manufacturer's Containment Sump & fittings: Follow manill icturers guidelines <br /> EXTENDED TESTING (RECOMMENDE C ): <br /> When extended testing is possible and you feel it is necessary;, t le following recommended <br /> guidelines are provided. The results and procedures are not sup sorted by Bravo Technical <br /> Support unless the sumps are of Bravo manufacture. <br /> If you use Pressure, a minimum test of 8 hours is t le guideline. <br /> If you use Vacuum, a minimum test of 2 hours is th guideline. <br /> Test per all local, State or federal regulations. <br /> Install D with <br /> 9 <br /> Confid ., ce <br /> r• <br /> I, <br /> BUILT LIKE IX TAN iK* <br /> Compatible when =submerged <br /> in fuels, biofuels nd alcohol <br /> blends up to E'C and 8100 <br /> r . <br /> 16 i-F-Series-Retrofit-SD-AB-1313 <br />