My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 3:35:59 PM
Creation date
2/6/2020 8:58:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rug 29 13 11 : 56a Elite V Contactors 12094616342 p. 15 <br /> FINAL = STEP 9 <br /> 0- ) <br /> MANDATORY PRESSURE TESTING: 4 <br /> COMPLETE ❑ <br /> To test your complete fitting installation after a full adhesive cure time :)f 4 hours minimum at 75°F <br /> or greater, conduct a pressure/soap test on all fittings, inside and o0: ide at all critical joints. <br /> Bravo Systems DoubleWall Containment Sump: Maximum 4 PSI i 'id minimum 20"hg Vacuum. <br /> Other Manufacturer's Containment Sump & fittings: Follow manill icturers guidelines <br /> EXTENDED TESTING (RECOMMENDE C ): <br /> When extended testing is possible and you feel it is necessary;, t le following recommended <br /> guidelines are provided. The results and procedures are not sup sorted by Bravo Technical <br /> Support unless the sumps are of Bravo manufacture. <br /> If you use Pressure, a minimum test of 8 hours is t le guideline. <br /> If you use Vacuum, a minimum test of 2 hours is th guideline. <br /> Test per all local, State or federal regulations. <br /> Install D with <br /> 9 <br /> Confid ., ce <br /> r• <br /> I, <br /> BUILT LIKE IX TAN iK* <br /> Compatible when =submerged <br /> in fuels, biofuels nd alcohol <br /> blends up to E'C and 8100 <br /> r . <br /> 16 i-F-Series-Retrofit-SD-AB-1313 <br />
The URL can be used to link to this page
Your browser does not support the video tag.