Laserfiche WebLink
1 abort r 2905 Railroad Ave. Ceres,CA 95307 209 581-9280 Fax 209 581-9282 <br /> ) ) . <br /> Ground Zero Analysis,Inc. Project Number: 400 <br /> 1714 Main Street Project Name: Gonzales Trucking Work Order No.: <br /> Escalon,CA 95320 Project Manager:Eric Price 1810028 <br /> Notes and Definitions <br /> DET Analyte DETECTED <br /> ND Analyte NOT DETECTED at or above the reporting limit <br /> NR Not Reported <br /> dry Sample results reported on a dry weight basis <br /> RPD Relative Percent Difference <br /> I <br /> I <br /> I <br /> Approved By <br /> Argon Laboratories,Inc. California D.O.H.S.Cert.#2359 <br /> Page 6 of 6 <br />