Laserfiche WebLink
Tony Gonzales Trucking 2 - 22 April 2008 <br /> Escalon, San Joaquin Coun <br /> Comments: <br /> The Report is acceptable, and Regional Board staff concurs to the conclusions of the <br /> groundwater investigation and soil gas survey, and the recommendation for site closure. <br /> i Please prepare a formal closure report in accordance to the Regional Board Appendix A - <br /> Reports, Tri - Regional Board Staff Recommendations for Preliminary Investigation and <br /> Evaluation of Underground Tank Sites, dated 16 April 2004, which may be downloaded at <br /> a <br /> i http://www.waterboards.ca.gov/centralvalley/water ,issues/underground storage tanks/ <br /> Also, provide a list of all properties and addresses within 250 feet of the site, for the public <br /> participation requirement for site closure. After the closure report is reviewed and accepted, <br /> you will be directed to start the 30-day public comment period for site closure. <br /> I <br /> Ifyouu have any_questions, please contact meat (916)464-4615 or by email at <br /> jbarton@waterboards.ca.gov. <br /> 41 :. <br /> James L.L. Barton, P.G. <br /> Engineering Geologist <br /> cc: Mr. Mark Owens, State Water Resources Control Board, UST Cleanup Fund, Sacramento <br /> Ms. Lorie Duncan, San Joaquin County Environmental Health Services, Stockton <br /> Mr. Eric Price, Ground Zero Analysis, Inc., 1714 Main St., Escalon 95320 <br />