My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACOB BRACK
>
18667
>
2900 - Site Mitigation Program
>
PR0528324
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 2:49:33 PM
Creation date
2/6/2020 9:12:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528324
PE
2965
FACILITY_ID
FA0019131
FACILITY_NAME
SUTTER HOME LODI WINERY
STREET_NUMBER
18667
STREET_NAME
JACOB BRACK
STREET_TYPE
RD
City
LODI
Zip
95242
APN
01109014
CURRENT_STATUS
01
SITE_LOCATION
18667 JACOB BRACK RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy/Jenks Consultants <br /> bottom of the boring to one to two feet above the screened section. The wells will be <br /> pre-developed after the filter pack is installed, and prior to the bentonite seal being installed. A <br /> two-to three-foot layer of protective bentonite clay pellets will be placed to minimize downward <br /> L migration of the grout seal into the filter pack. A neat cement grout will be placed above the <br /> bentonite extending continuously from the top of the bentonite pellet layer to less than one foot <br /> below grade. Based on the construction of existing wells, it is anticipated that this grout seal will <br /> be extended to an approximate depth of three to four feet bgs. <br /> A locking expansion cap and well-housing enclosure will be installed to control access to the <br /> well opening. Wells located in unpaved areas off of the access roads will be completed above <br /> grade and furnished with a protective, locking steel casing. Wells located in access roads will be <br /> completed with a traffic-rated surface monument. Each surface monument will be completed <br /> one to two inches above grade and furnished with a sloping concrete apron to facilitate surface <br /> drainage away from the well. A schematic diagram of well construction details is shown on <br /> Figure 6. <br /> Sampling equipment will be steam cleaned between boreholes. The augers will not be steam <br /> cleaned between boreholes. <br /> 4.2.2 Development <br /> After waiting a minimum of 48 hours to allow curing of the grout and concrete, the monitoring <br /> wells will be developed by surging and pumping until the water removed from the wells is <br /> sediment-free, no further improvement in water quality is observed, or 10 casing volumes have <br /> been purged. Field parameters of pH, temperature, and conductivity will be recorded. <br /> Development equipment will be decontaminated between wells using non-phosphate soap and <br /> potable water with a final rinse with distilled water. <br /> The monitoring wells will be allowed to recover for a minimum of 72 hours following well <br /> development, prior to monitoring and sampling. Development water will be contained at the well <br /> site and then discharged on the ground at the well site in a manner that does not interfere with <br /> Lsite safety. <br /> 4.3 Groundwater Sampling and Analysis <br /> Initial samples will be collected from the monitoring wells no sooner than 72 hours after the <br /> newly installed monitoring wells have been developed. Groundwater sampling will be performed <br /> in accordance with the Kennedy/Jenks' SOG for Groundwater Sampling (Appendix B). The <br /> ! water level at each new well will be measured relative to the top of well casing to +/- 0.01 feet <br /> accuracy before purging, and the date and time will be recorded. At least three casing volumes <br /> of water will be purged from each monitoring well prior to sampling in order to acquire samples <br /> representative of aquifer conditions. The field parameters pH, temperature, and specific <br /> ►� conductance will be monitored during purging to document stabilization. The parameters will be <br /> measured in accordance with Kennedy/Jenks' SOG for Field Measurement of pH, Temperature, <br /> and Specific Conductance (Appendix B). Purge water will be distributed on the ground at the <br /> L well site. <br /> v Following collection, groundwater samples will be submitted to a state-certified laboratory for <br /> analysis. The laboratory will follow its normal turn-around-time and internal quality <br /> L Monitoring Well Installation Work Plan Page 11 <br /> Sutter Home Winery, Lodi, California <br /> gls-group)ameVoE109`08 517 S"homekOg epoliNrwJr¢WI-w WAC <br />
The URL can be used to link to this page
Your browser does not support the video tag.