My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACOB BRACK
>
18667
>
2900 - Site Mitigation Program
>
PR0528324
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 2:49:33 PM
Creation date
2/6/2020 9:12:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528324
PE
2965
FACILITY_ID
FA0019131
FACILITY_NAME
SUTTER HOME LODI WINERY
STREET_NUMBER
18667
STREET_NAME
JACOB BRACK
STREET_TYPE
RD
City
LODI
Zip
95242
APN
01109014
CURRENT_STATUS
01
SITE_LOCATION
18667 JACOB BRACK RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW <br /> Kennedy/Jenks Consukants <br /> Section 3: Field Activities <br /> 3.1 Location of Wells <br /> Wells GW-5, GW-6, and MW-1 are located in an area that will be reconstructed as part of the <br /> LAA expansion. These two monitoring wells and one piezometer will be destroyed. After <br /> reconstruction of the LAA is completed, replacement wells GW-5R and GW-6R will be installed <br /> on the north-south trending roadway located on the west side of the reconfigured LAA. The <br /> locations are shown on Figure 3. The piezometer MWA, the existence of which was only <br /> recently realized by Sutter Home, is not needed and will not be replaced. <br /> 3.2 Pre-Field Activities <br /> Kennedy/Jenks will perform the following activities prior to commencing fieldwork at the Site. <br /> • Revise the site-specific Hazard Appraisal and Recognition Plan (attached as Appendix A). <br /> • Obtain well destruction and installation permits from San Joaquin County. <br /> • Survey the proposed boring locations to identify subsurface utilities by performing a utility <br /> clearance check prior to drilling. Kennedy/Jenks will contact Underground Service Alert for <br /> utility clearance at least two working days before the scheduled fieldwork. In addition, a <br /> private subsurface utility locating service will be retained to perform a search for <br /> underground utilities at the proposed drilling locations. <br /> • Contract with a C-57 licensed drilling contractor to perform the fieldwork. <br /> • Develop the newly-installed monitoring wells. <br /> 3.3 Groundwater Monitoring Well Destruction <br /> Three wells (MW-1 [used as a piezometer), GW-5 and GW-6)will be destroyed in advance of <br /> the LAA reconstruction. <br /> The drilling contractor will first remove the steel standpipe at each location. The well will be <br /> sounded to verify its depth, then the contractor will overdrill the well with augers no less than <br /> 7-inch diameter, fitted with a 'stinger' or other feature that assures the augers will follow the well <br /> casing. <br /> After drilling to total depth, the contractor will remove the augers from the borehole, attach a <br /> wood bung to the lead auger, and re-drill to the total depth. After inserting tremie pipe, the <br /> contractor will eject the wood bung and pump cement grout through the tremie pipe into the <br /> augers until all of the formation water in the augers is displaced and the augers are filled with <br /> grout. The grouting will be done under the direction of a San Joaquin County grout inspector. <br /> Monitoring Well Replacement Work Plan Page 4 <br /> Sutter Home Winery, Lodi, California <br /> gV mupWnn4obb8'OBfi5 ,15_wtte,Iwmea pwh winstauwy*Adw <br />
The URL can be used to link to this page
Your browser does not support the video tag.