Laserfiche WebLink
Brown Sand,Inc. <br /> Spill Prevention, Control, and Countermeasures Plan Page: 24 <br /> June 3, 2020 <br /> AST Inte ri Testin2 Table <br /> Material AST Type Tank Date of Type of AST Testing Last Due <br /> Tank ID Stored &Size Manufacture Installation Footing Category Required Formal Date <br /> Testing <br /> Horizontal, Monthly <br /> Waste Oil Waste Oil single walled Unknown Shop Built Concrete Category 1 P 6/2020 and <br /> Tank steel 1,000 Annual <br /> gallons thereafter <br /> Horizontal, Monthly <br /> Transmission Transmission single walled and <br /> Oil Tank Oil steel 350 Unknown Shop Built Concrete Category 1 P 6/2020 Annual <br /> gallons thereafter <br /> Horizontal, Monthly <br /> Hydraulic Oil Hydraulic Oil single walled Unknown Shop Built Concrete Category 1 P 6/2020 and <br /> Tank steel 350 Annual <br /> allons thereafter <br /> Horizontal, Monthly <br /> Motor Oil Motor Oil single walled Unknown Shop Built Concrete Category 1 P 6/2020 and <br /> Tank steel 500 Annual <br /> gallons thereafter <br /> Horizontal, <br /> On Road Diesel Fuel single walled Unknown Shop Built Concrete Category 1 P,E(20) NA E-2020 <br /> Diesel Tank #2 steel 6,000 <br /> allons <br /> Horizontal, Monthly <br /> Gasoline Gasoline double walled Unknown Shop Built Concrete Category 1 P 6/2020 and <br /> Tank concrete Annual <br /> 1,000 gallons thereafter <br /> Off Road Horizontal, Monthly <br /> Diesel#1 Red Dye single walled Unknown Shop Built Concrete Category 1 P 6/2020 nd <br /> Tank Diesel Fuel steel 5,000 Annual <br /> gallons thereafter <br /> Off Road Vertical, <br /> Diesel#2 Red Dye double walled 7/1989 Shop Built Concrete Category 1 P,E(20) NA E-2020 <br /> Tank Diesel Fuel steel 6,000 <br /> gallons <br /> P—Periodic AST Inspection(monthly and annual visual, no certified inspection required) <br /> E—Formal External Inspection by Certified Inspector <br /> ( )—indicated maximum inspection interval in years <br /> NA-not applicable <br /> 3.9 Site Security (40 CFR 112.7(g)) <br /> The facility is completed fenced and gated by a 6-foot high chain link fence. In addition, <br /> the maintenance yard is also surrounded by a 6-foot high chain link fence. All gates are <br /> locked during non-operating hours. The dispensers are operated by an electronic card lock <br /> system which limits access to the dispenser island. Security lights are located throughout <br /> the yard which illuminates the aboveground storage tank to allow for the discovery of <br /> discharges and to deter acts of vandalism. <br />