Laserfiche WebLink
SPILL PREVENTION CONTROL AND COUNTERMEASURE <br /> COMPLIANCE INSPECTION PLAN <br /> REVIEW PAGE <br /> In accordance with 40 CFR 112.5(b), a review and evaluation of this SPCC Plan is conducted at <br /> least once every five years. As a result of this review and evaluation,Brown Sand,Inc.will amend <br /> the SPCC Plan within six months of the reviews to include more effective prevention and control <br /> technology if: <br /> (1) Such technology will significantly reduce the likelihood of a spill event from the facility, and <br /> (2) If such technology has been field-proven at the time of review. Any amendment to the SPCC <br /> Plan shall be certified by a Professional Civil Engineer within six months after a change in the <br /> facility design, construction, operation, or maintenance occurs which materially affects the <br /> facility's potential for the discharge of oil into or upon the navigable waters of the United States <br /> or adjoining shorelines. <br /> Review Dates Signature <br /> 1. <br /> 2. <br /> 3. <br /> 4. <br /> 5. <br /> 6. <br />