My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
715
>
2900 - Site Mitigation Program
>
PR0540782
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 10:32:04 AM
Creation date
2/6/2020 9:50:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0540782
PE
2960
FACILITY_ID
FA0023314
FACILITY_NAME
RMB GARAGE
STREET_NUMBER
715
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905409
CURRENT_STATUS
01
SITE_LOCATION
715 N HUNTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Messrs Trommer and La, P)n 30 June 2008 <br /> Preliminary Five-Year Review Letters Page 2 of 5 <br /> Various Sites <br /> 1 justifications for these proposals. The EHD will direct rebound testing with <br /> evaluation of the sustainability of significant vapor concentrations a test objective; <br /> the EHD will also direct a work plan for confirmation borings to evaluate <br /> effectiveness of the previous SVE/IAS operation and identify locations where <br /> additional SVE wells may be beneficial . The EHD will also direct a vapor intrusion <br /> evaluation for the site . <br /> 2315 EI Dorado Street, N . <br /> • The CUF recommended that the EHD direct the RP to continue to operate the <br /> groundwater remediation system and maximize it as necessary to achieve <br /> WQOs in a timely manner. The EHD agrees with this recommendation . Dual <br /> phase extraction has been employed on the site; a letter will be issued to <br /> revaluate the DPE operation and recommend appropriate modifications, if <br /> needed , to maximize contaminant mass recovery. <br /> 6230 Pacific Avenue <br /> • The CUF recommended that the EHD direct the RP to assess an alternative <br /> groundwater treatment technology that will achieve WQOs more rapidly and cost <br /> effectively; the EHD agrees with this recommendation . A meeting was held with <br /> the RP in January 2008 to discuss various proposals to maximize the cost <br /> effectiveness of the remediation effort in view of the diminishing CUF monies <br /> available for this site. The proposals presented to the EHD were given as options <br /> with estimated cost and effect on the depletion date of CUF monies; technical <br /> justifications were not provided , nor were any professional recommendations. <br /> The EHD has issued a directive to submit a feasibility study if an appropriate <br /> technology can be employed , with technical and cost effectiveness evaluations. <br /> The EHD also noted the need for additional plume delineation . <br /> 517 Fremont Street, E. <br /> • The CUF recommended that the EHD direct the RP to assess remedial <br /> technologies and implement active remediation to achieve WQOs in a timely <br /> manner. The EHD agrees with this recommendation . Remediation wells have <br /> recently been installed and a pilot test proposed . The EHD will direct prompt <br /> performance of the pilot test. <br /> 420 Yosemite Avenue, W. <br /> • The CUF has recommended that the RP reduce monitoring frequency and that <br /> the EHD direct the RP to add additional remedial technology to achieve WQOs <br /> more rapidly, also the CUF noted that the plume was poorly defined toward the <br /> northwest. The EHD agrees with these recommendations. By letter dated 26 <br /> September 2007, the EHD approved a reduction of sampling frequency for <br /> selected wells and directed differentiation of total petroleum hydrocarbons <br /> quantified as gasoline (TPHg ) from tetrachloroethylene (PCE) by EPA Method <br /> 8260B . A GWE system operated from January 2002 to September 2007; a work <br /> plan has been submitted for installation and utilization of two additional GWE <br /> wells ; the EHD will review the work plan and comment as appropriate. The EHD <br /> will issue a directive to complete the plume delineation toward the northwest and <br /> has issued a directive to perform a vapor intrusion evaluation . <br /> 5-Year Review Comment Letter 063008.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.