My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
715
>
2900 - Site Mitigation Program
>
PR0540782
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 10:52:10 AM
Creation date
2/6/2020 9:52:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540782
PE
2960
FACILITY_ID
FA0023314
FACILITY_NAME
RMB GARAGE
STREET_NUMBER
715
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905409
CURRENT_STATUS
01
SITE_LOCATION
715 N HUNTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 May 2002 <br /> AGE-NC Project No. 01 -0877 <br /> j Page 6 of 9 <br /> 3 . 3 , MONITORING WELL INSTALLATION, DEVELOPMENT AND SURVEY <br /> Following installation, each well will be developed to maximize water flow and minimize the <br /> -� amount of fine-grained sediment drawn into the well during pumping or bailing. After development, <br /> the top of each newly installed well casing (well head) will be surveyed to determine its elevation <br /> relative to mean sea level. Procedures for well installation, development and survey are presented <br /> I <br /> n Sections 4.2 . and 4.3 ., respectively. <br /> l 3 .4. GROUND WATER SAMPLE COLLECTION AND ANALYSIS <br /> Ground water monitoring and sampling activities for each newly installed ground water monitoring <br /> .I well will be conducted on a quarterly basis unless an alternate schedule or suspension of monitoring <br /> is approved by the EHD. Ground water monitoring activities will include recording depth to ground <br /> water measurements and collection of ground water samples for laboratory analysis. Ground water <br /> r sample collection procedures are described in Section 4.4. 3 . <br /> , J <br /> _ Ground water samples will be analyzedby a DHS-certified laboratory for the following constituents: <br /> TPH-g, TPH-d and TPH-mo by EPA Method 8015 Modified; <br /> • BTEX by EPA Method 8260. <br /> I <br /> • Fuel additives MTBE, TBA, DIPE, ETBE, TAME, EDB and 1 ,2-DCA by EPA Method <br /> -I8260. <br /> Laboratory reports for ground water analyses, testing methods, laboratory quality assurance/quality <br /> control (QA/QC) reports, and sample chain-of-custody documentation willbe presented inthereport. <br /> I . I 3 . 5 , PREPARATION OF REPORT OF FINDINGS <br /> Following the field activities and each ground water monitoring event, a quarterly report will be <br /> prepared presenting the findings. Each report will include a description of work performed and the <br /> results of the soil and/or groundwater sampling and analysis; conclusions and recommendations will <br /> also be included, if applicable. The report will be in a format acceptable to the EHD, and will be <br /> reviewed and signed by a California Registered Geologist. <br /> iI <br /> Advanced GcoEnvironmental, Inc. <br /> f <br /> �J <br />
The URL can be used to link to this page
Your browser does not support the video tag.