My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003179
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003179
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 11:52:11 AM
Creation date
2/6/2020 10:21:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003179
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FARMER PROPERTY <br /> REMEDIATION SYSTEM MONITORING SHEET <br /> Inspector Name A to X Date of Inspection 0%2?O'4 <br /> Project Name Farmer Property Project Number 54 62596 0001 <br /> Project Location 610 North Hunter Street Stockton CA Project Manager Drew Van Atlen <br /> VE5 Component <br /> Monitoring Point Vacuum (Hg) Flowrate(cfm) FID(ppm) Sampled <br /> VW1 �- <br /> VW2 C S <br /> VW3c ra <br /> VW4 -�� fQ ZVI- <br /> Influent before dilution L „V. 3�5 <br /> Influent after dilution ZZT t ^ ...—.� <br /> Effluent NA NA <br /> System Status up/down Dilution valve C/ ye <br /> TO Cumulative Run Time 1&61 f f y�--Z Propane% -2,5 <br /> T O High/Low Temperature at Arrival 14 F90Piping System Q <br /> T O Vacuum at Arrival [h "�G Pipe Size I D 2^ <br /> Notes inclj�ding a y adjus e t made to the VES system <br /> a <br /> --A <br /> Component <br /> • Monitoring Point Pressure (psi) Flowrate (Ifm) Groundwater Sample Collected <br /> AS1 <br /> AS2 , ^' <br /> Influent ® NA <br /> System Status up/down C'1 ,,�`` ,,,Pipe Size I D 2" <br /> Piping System 5,,&11 teak PYG Jof� jQ�N4ie rticulate filters l a <br /> Notes including any adjustments made to the AS system <br /> ate <br /> oundwr?reatment <br /> � ._ -to Component <br /> MonitoringPoint Pressure(psi) Total flow Groundwater Sample Collected <br /> Influent NA NA <br /> Post vessel#1 NA <br /> Effluent NA <br /> Total Groundwater Discharged 09W S7 4. LEL Meter Reading <br /> Inspect piping system Particulate filters �la . <br /> tes in Judi g any adjustments made to the groundwater treatment system <br /> 62596/tables/remsysinspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.