My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003197
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 11:59:39 AM
Creation date
2/6/2020 10:30:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003197
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' FARMER PROPERTY <br /> REMEDIATION SYSTEM MONITORING SHEET <br /> ' Inspector Name 41QX rIO,(e-s Date of Inspection Ila 1,05 <br /> Project Name Farmer Property Project Number 54 62596 0001 <br /> Project Location 610!North Hunter Street Stockton CA Project Manager Jeanne Homsey <br /> VES Corerponent r��,} <br /> Monitoring Point Vacuum (Hg) Flowrate (cfm) FID(ppm) Sampled <br /> VW1 �� S <br /> VW2 c <br /> W13 Gro a al <br /> VW4 <br /> MW1 <br /> Influent before dilution <br /> Influent after dilution 2-t , <br /> Effluent NA NA <br /> System Status up/down JoWel - Rzs+.0 � Dilution valve d'5'_cl <br /> T O Cumulative Run Time 0 Ajar�S ( Propane% �5 f <br /> T O High/Low Temperature at Arrival 66 — 1Si8f 12(`� Piping System � 00 <br /> T O Vacuum at Arrival _0' — AXE O Pipe Size I D 2" <br /> ' Notes including any adjustments made to the VES system <br /> Z 114 it <br /> Cpropnnexrt -71 <br /> Monitoring Point Pressure (psi) Flowrate(Ifm) Groundwater Sample Collected <br /> AS1 <br /> ' AS2 5. <br /> Influent r O NA <br /> System Status upldown Lre Pipe Size I D 2" <br /> ' Piping System & pp of Particulate filters <br /> Notes including any adjustments made to the AS system <br /> - -Groundwater Treatment Component <br /> _ - <br /> Monitoring Point Pressure(psi) Total flow Groundwater Sample Collected <br /> ' Influent NA NA <br /> Post vessel#1 NA -IS <br /> Effluent NA <br /> ' Total Groundwater Discharged Q 7-2-y" f f - LEL Meter Reading <br /> Inspect piping system G oCn'A Particulate filters <br /> ' Notes including any adjustments made to the groundwater treatment system <br /> 1 <br /> ' 625961tables/remsysinspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.