My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003197
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 11:59:39 AM
Creation date
2/6/2020 10:30:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003197
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eFARMER PROPERTY <br /> REMEDIATION SYSTEM MONITORING SHEET <br /> ' Inspector Name Alex Flores Date of Inspection <br /> Protect Name Farmer Property Protect Number 54 62596 0009 <br /> Protect Location 610 North Hunter Street, Stockton,CA Protect Manager Jeanne Homsey <br /> VE$,�COmponent <br /> ' Monitoring Point Vacuum (Hg) Flowrate(cfm) FID(ppm) Sampled <br /> VW1 O <br /> VW2 <br /> ' VW3 <br /> VW4 <br /> MW1 yr <br /> Influent before dilution ; <br /> Influent after dilution <br /> ' Effluent NA NA <br /> Dilution valve K trk <br /> System Status upldown �1CUJh --� �� � <br /> ' <br /> TO Cumulative Run Time 011'931(05' Propane% 95- <br /> TO <br /> 5-TO High/Low Temperature at Arrival far Piping System ]IL p V <br /> TO Vacuum at Arrival 0 Pipe Size I D 2' <br /> ' Notes including any adjustments made to theVES systeI Ent" e <br /> (Ck <br /> ' J , <br /> ew <br /> Monitoring Point Pressure(psi) Flowrate(Ifm) Groundwater Sample Collected <br /> AS1 <br /> ' AS2 <br /> Influent NA <br /> System Status upldown to\.,J t Pipe Size I D 2° <br /> ' Piping System Particulate filters <br /> Notes including any adjustments ado to the AS system <br /> Pfrr�c,Yre �J �,c.G inz 1.ea1-:K1 dA Ir . <br /> m ,Groundwater Treatment Component <br /> Monitoring Point Pressure(psi) Total flow Groundwater Sample Collected <br /> ' Influent <br /> Post vessel#1 5 <br /> Effluent <br /> ' Total Groundwater Discharged 0-12.4, 2. LEL Meter Reading of <br /> Inspect piping system ()K- Particulate filters <br /> ' Notes including any adjustments made to the groundwater treatment system <br /> ptotl.a(. Qtwwc� (Za��q�a�c Up?&( tov- 4pew Lt Q,jw,,p 414t00b Z45 It ko.Sg, bu sparlF-�,,� <br /> ' 62596/tables/remsysinspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.