Laserfiche WebLink
t <br /> A S S O C I A T E S I N C <br /> Vapor Analytical Results <br />' TPHg and BTEX constituents were detected in all of the vapor samples except from the effluent <br /> sample taken on November 21, 2003 TPHg concentrations in samples collected from vapor wells <br />' VW1, VW2, VW3, and VW4 ranged from <2 5 parts per million by volume (ppmv) to 1,400 <br /> ppmv The influent concentrations of TPHg ranged from <2 5 ppmv to 440 ppmv and the effluent <br /> concentration of TPHg ranged from <2 5 ppmv to 29 ppmv Benzene concentrations in samples <br /> collected from vapor wells V W 1, VW2, VW3, and VW4 ranged from <0 05 to 0 83 ppmv The <br /> influent concentrations of benzene ranged from 0 27 ppmv to 0 41 ppmv and the effluent <br /> concentrations were all reported at <0 05 ppmv The effluent concentrations are within the <br /> t requirements of the San Joaquin Valley Air Pollution Control District (SJVAPCD) permit to <br /> operate Vapor analytical data are summarized in Table 2 and vapor data sheets are contained in <br /> Attachment 4 <br /> tWater Treatment System Analytical Results <br /> Low concentrations of TPHg, Toluene, and/or Xylenes were detected above laboratory reported <br /> detection limits in the influent water samples collected from the groundwater treatment and <br /> discharge component of the vapor extraction system The effluent water samples collected from <br /> the treatment and discharge component of the vapor extraction system contained no detectable <br /> concentrations of TPHg or BTEX MTBE, TAME, ETBE, DIPE, TBA, 1,2-DCA, and EDB <br /> were not detected in the influent or effluent samples A summary of analytical results is <br />' presented in Table 3 Groundwater laboratory data sheets and chain-of-custody documentation <br /> are contained in Attachment 2 <br /> Air Sparge System Monitoring <br /> The installation of the air sparge piping system located at the site is detailed in ATC's <br />' Remediation System Installation Report for the Farmer Property, 610 North Hunter Street, <br /> Stockton, California, dated April 8, 2003 ATC started the air sparge system on February 13, 2003 <br /> During the current reporting period, ATC personnel monitored the air sparge system on October 24, <br /> tNovember 21 and December 30, 2003 Parameters monitored in the field included flow rates and <br /> induced pressure responses at on-site wells if applicable Field monitoring data are contained in <br /> Attachment 3 <br /> REMEDIATION SYSTEM EVALUATION <br /> Vapor Extraction System <br /> t From September 30 to December 30, 2003, the vapor extraction system was operational for <br /> approximately 1,650 5 hours From September 30 to December 30, 2003 the average extracted <br /> vapor flowrate was approximately 170 cubic feet per minute (cfm) and the average influent vacuum <br /> s lenviro1625961quart1yl4gr-2003 doe 5 <br /> t <br />