My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003203
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:03:22 PM
Creation date
2/6/2020 10:50:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003203
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iFARMER PROPERTY <br /> REMEDIATION SYSTEM MONITORING SHEET C�it1 S/T6 f�•ao <br /> inspector Name G 5,0.7 Date of Inspection X -->V-0y <br /> Project Name Farmer Property Project Number 54 62596 0001 <br /> Project Location 610 North Hunter Street, Stockton, CA Project Manager Drew Van Allen <br /> Monitoring Point Vacuum (Hg) Flowrate FID(ppm) Sampled <br /> Vw1 S.5"" A-) Y ;P TZ51 e <br /> Z vw2 0 tr ,v <br /> s Vw3 -796 (Wfs.�c� <br /> 3 VW4 3.o Jt ZZO Z7Lfpm 1'rl;ST <br /> I Influent before dilution 9.011,4I GF 2.30 ?,Pr-A- V 42 <br /> �( Influent after dilution A ), N /l1 <br /> i Effluent NA NA •`g' ygwin A 1 <br /> System Status upidown G(j.) Dilution valve. -,.lit `uek1 <br /> TO Cumulative Run Time -577g S Propane% 577, <br /> TO High/Low Temperature at Arnval 173 '5&:3 Piping,System p <br /> T O Vacuum at Arrival X1.2-1,t Pipe Size I D 2" <br /> rNotes including any adjustments m7 ade to the VES system <br /> Monitoring Point Pressure (psi) Flowrate (Ifm) Groundwater Sample Collected <br /> ASI L ry <br /> AS2 ,z s <br /> Influent z L NA <br /> System Status up/down LAP Pipe Size 1 D <br /> Piping System m Particulate filters G� o T. „, <br /> Notes Including any adjustments made to the AS system <br /> k w� tl <br /> wil <br /> k � <br /> Monitoring Point Pressure (psi) Total flow Ground er'Sample Collected ,~ <br /> Influent NA NA <br /> Post vessel#1 NA <br /> Effluent NAY $.' <br /> r,3 g <br /> Total Groundwater Discharged- 13Y $'l 7 7-r6d,� -'y- <br /> ,201133 <br /> LEL lu ter Reading —12-5 <br /> Inspect piping system ai4 F >C Parttaula#e filters <br /> w tX <br /> Notes including any adjustments made to the groundwater treatment system- <br /> I <br /> 62596/tables/remsysin spection <br /> /� :...35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.