My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003212
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:24:18 PM
Creation date
2/6/2020 11:03:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003212
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FARMER PROPERTY <br /> REMEDIATION SYSTEM MONITORING SHEET <br /> . Inspector Name Drew Van Allen Date of Inspection 12/27/02 <br /> Project Name Farmer Property Project Number 54 62596 0001 <br /> Project Location 610 North Hunter Street, Stockton, CA Project Manager Drew Van Allen <br /> VE$C�i�3ponent <br /> Monitoring Point Vacuum (Hg) Flowrate(cfm) FID(ppm) Sampled <br /> VW1 76 NM 89 No <br /> VW2 82 NM 116 No <br /> VW3 73 NM 55 No <br /> VW4 95 NM 32 No <br /> Influent before dilution 90 85 scfm 13 No <br /> Influent after dilution 90 NM NM No <br /> Effluent NA NM NM No <br /> System Status up/down Up Dilution valve Not changed <br /> TO Cumulative Run Time 199 9 hours Propane% 65% <br /> T O High/Low Temperature at Arrival 1451 Piping System OK <br /> TO Vacuum at Arrival 90 Pipe Size I D 2" <br /> Notes including any adjustments made to the VES system <br /> The sampling ports have not been installed yet and the ports for measuring the flowrate have not been installed Made <br /> temporary sampling ports to collect vapor samples for FID measurement <br /> AS Component <br /> Monitoring Point I Pressure(psi) Flowrate(Ifm) I Groundwater Sample Collected <br /> AS1 <br /> AS2 <br /> Influent NA <br /> System Status up/down Pipe Size I D 2" <br /> Piping System Particulate filters <br /> Notes including any adjustments made to the AS system <br /> Air sparge system has not been started yet <br /> Groundwater Treatment Component <br /> Monitoring Point I Pressure (psi) Total flow Groundwater Sample Collected <br /> Influent NA NA Yes, TPHgBTEX/Oxygenates <br /> Post vessel#1 7 NA Yes,TPHg/BTEX/Oxygenates <br /> Effluent NA 7,510 Yes,TPHg/BTEX/Oxygenates <br /> Total Groundwater Discharged 7,510 LEL Meter Reading <10% <br /> Inspect piping system OK Particulate filters OK <br /> Notes including any adjustments made to the groundwater treatment system <br /> . The volume of water pumped through the carbon filtration system when the water level switch is activated <br /> is about 100 gallons The small tank only has a capacity of about 50 gallons from the top of the tank to the <br /> discharge point on the tank Water is spilling out the top of the small tank and the high water level sensor in the <br /> small tank is not working Water is getting in the air sample pump for the LEL <br /> 62596/tables/remsysi nspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.