My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003269
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
3500 - Local Oversight Program
>
PR0545287
>
ARCHIVED REPORTS_XR0003269
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 3:38:08 PM
Creation date
2/6/2020 11:59:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003269
RECORD_ID
PR0545287
PE
3528
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
02
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' KLFlNFELDER <br /> PID readings in boring B-1, drilled under tank T2, ranged from 90 ppmv to 170 ppmv and <br /> increased with depth PID readings also increased with depth in boring B-2, drilled under <br /> tank T2, and ranged from 30 ppmv to 350 ppmv. PID readings for boring B-3, drilled to the <br /> east of tank T1, ranged from 0 ppmv to 25 ppmv There were no PID readings above <br /> 0 ppmv for boring B-4, drilled to the west of tank T1. Table 1, "Summary of Soil <br /> Laboratory Data," presents the PID readings for the samples submitted for analysis. A <br /> ' complete set of PID readings at 5-foot intervals is presented on the boring logs in <br /> Appendix B <br /> 3.5 EQUIPMENT DECONTAMINATION <br /> ' To reduce the potential for cross-contamination, augers and associated equipment were <br /> ' steam cleaned prior to drilling each boring In addition, sampling equipment was cleaned <br /> with a trisodium-phosphate wash and rinsed with distilled water prior to collecting each soil <br /> sample <br /> 3 6 SOIL DISPOSITION <br /> Drill cuttings were placed in 55-gallon drums, labeled with the boring number and drilling <br /> ' date, and left on site Soil from borings B-3 and B-4 {tank T1} did not contain petroleum <br /> hydrocarbon concentrations and the disposal of this soil should not be regulated The soil <br /> should be able to be disposed of on site or as the client desires Soil from borings B-1 and <br /> B-3 {tanks T2, T3} did contain petroleum hydrocarbon concentrations and will require <br /> treatment or disposal at an appropriate facility The client may want to retain the <br /> ' contained soil on site until the disposition of the tanks is further evaluated <br /> 3.7 BORING CLOSURE <br /> ' Upon completion of drilling and sampling, the soil borings were closed by backfilling with a <br /> cement/bentonite grout mixed by the drilling crew Ms Linda Turkette of the San Joaquin <br /> 1 County Health Department was present during the grouting of the borings <br /> FR25-91-29 Page 6 of 11 <br /> ' Copyright 1991 Kleinfelder, Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.