Laserfiche WebLink
r <br /> c <br /> ARCO / BP WELL MONITORING DATA SHEET <br /> BTS #. 01&.6VIA S— 1 Station #. 1(t o L1-3"l <br /> Sampler S Date- G — 1 1 --60 <br /> Well I D t,.S -- Well Diameter. 2 3 6 8 <br /> Total Well Depth- 7 �_'-��� Depth to Water: 5(o. :93 <br /> Depth to Free Product Thlckaess ofFiee Product (feet) <br /> Referenced to Pv Grade D 0. Meter (if req'd)' vsI D HACH <br /> b� Weil Diameter Mr ficr Well Diameter M111hpller ti <br /> 1" 004 4" 065I•� �. S <br /> 7' 016 6^ 147 <br /> 3" 037 Other radius'"0 163 <br /> Purge Method Bailer Sampling Method Sager <br /> Disposable Bailer Disposable Bailer <br /> Middleburg Extraction Poet <br /> Elt:ctnc Submersible Other <br /> Extraction Pump <br /> Other <br /> Top of Screen If well is listed as a no-purge,confirm that water level is below the top <br /> of screen Otherwise, the well must be purged <br /> i <br /> rr <br /> • 1 Y 3 = LO_ ._�) Gals <br /> 1 Case Volume(Gals) Specified Volumes Calculated Volume <br /> Conductivity <br /> Time Temp (°F) pg (013 ox2b Cats Removed Observations <br /> t d�3 `?3 '� •� 1 o t�'3 . Z� <br /> -Z- <br /> LIC� <br /> o q -73,6 10 Z- � LVL"�> <br /> I <br /> I <br /> Did well dewater9 Yes No Gallons actually evacuated. k-k <br /> Sampling Time DS a Sampling Date <br /> I <br /> Sample I D : Laboratory. Pace Eoia) Other <br /> I <br /> Ari alyzed for H-c 7['>r MTBE TPH-D Other p)C <br /> O (if req'd) P1 e-purge �rg/L Post-purge L�� n'`irr <br /> O R P. (if leq'd) Pie-purge mV Post-purge mil <br /> Blaine Tech Services, inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />