My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
3500 - Local Oversight Program
>
PR0545347
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 3:55:53 PM
Creation date
2/6/2020 3:15:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545347
PE
3528
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
02
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EN OACHME'NT PERMIT REQUH1 ENIL,NTS <br /> The City of Majiteca Public Works Department requires that each contractor-shall follow requirements set <br /> forth below while working on or near the public right of way. Noncompliance with the following items may <br /> result in.the stoppage of work and/or the revoking of the eiacmaclunent permit. <br /> -I. SIGNING <br /> A. All signing must conform to the most current edition of the Manual ofToffic Controls for <br /> Construction and Maintenance Work Zories. <br /> B. Signs shall be placed on traffic standards (flag trees) or fixed to permanent posts. Flags shall be <br /> inserted in traffic standards. PLACEMENT OF SIGNS-.ON BARRICADES IS FORBIDDEN. <br /> C., Signs in the work zone will be maintained at all times. <br /> D. Signs.shall be'.elean and legible. <br /> .E. Flaggers will wear orange vests and hard.hats at all times and use stop and slow paddles. Paddles <br /> will be held by flaggers. Paddles will be held by flaggers. Paddles will not be placed in cones or on <br /> barricades. Flaggers will not do any other work than flagging.- <br /> F. <br /> lagging.F. A worksite traffic plan shall be submitted for review to the Traffic Engineer seventy=t vo (72)hours <br /> prior to commencement of work. No work will begin until the worksite traffic plan has been <br /> accepted and signed off by the City Engineer. <br /> U. CONSTRUCTION- <br /> A. ' Your attention is directed to the general provisions listed on the back of the encroacl=ent pernait. <br /> I3. Street cuts, where portions of street paving have been removed,will be cold patched at the end of the <br /> working day. <br /> C. Streets will be swept clean at the end of each-Working day to the satisfaction of the City Engineer. <br /> D. No construction materials are to be stacked in public right of way unless permitted by the City <br /> Engineer. <br /> E. Water permits are required.for each construction project. Only approved fire hydrant*" renblies may <br /> be used to draw water from City fire hydrants. All water trucks shall have approved air gaps. <br /> F. All final inspection repairs are to be completed within five (5)working days upon receipt of list. <br /> G. Show proof of City of Manteca business license prior to issuance of encroachment permit. <br /> I am an officer of the company and have read the above requireihents and tuiderstand the regulations as <br /> stated. <br /> NAME: DATE: <br /> COMPANY: <br /> i�i fes,•,,.;��o„,.._,.,,.,.,� .r,... <br />
The URL can be used to link to this page
Your browser does not support the video tag.