Laserfiche WebLink
�.i Groundwater Investig� and Groundwater Extraction Work Plan <br /> Boyett Petroleum,419 S.Main Street,Manteca <br /> May l6,2006 <br /> Page 5 <br /> jBoyett Petroleum will prepare a pre-approval request for the batch groundwater extraction that will be <br /> submitted to the Cleanup Fund. The installation of the batch groundwater extraction equipment will <br /> commence upon receipt of approval from the Cleanup Fund and notification from Boyett Petroleum to <br /> proceed. If you have any questions or need additional information, please call Lee Morse at (209) 388- <br /> 9601. <br /> Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES,INC. <br /> �\Gr1AL GAG <br /> Z/ <br /> O <br /> QO LEE H. MORSE Un <br /> a <br /> Lee H. Morse, P.G. 7654 <br /> o <br /> Associate Geologist S� No. �Q- <br /> i OF CALF®� � <br /> P:\3000_pd\3761 Boyett Manteca\3761C Boyett Manteca Groundwater Monitoring\Work Plans\Groundwater Investigation Work Plan.doc <br /> irk <br /> rJ <br /> f <br /> I <br /> �J <br /> t <br /> c <br /> �.� CONDOR <br />