Boyett Petroleum May 18, 2000 <br /> 419 South Main Street, Manteca, California Page 4 <br /> Work Plan for Lateral Extent <br /> of Groun(lwater Contamination (Ad(lendum) <br /> The borings will be logged under the direct supervision of a registered professional using <br /> the Unified Soil Classification System (Figure 4). The color, texture, moisture, plasticity (if <br /> applicable), consistency of the earth materials, pertinent soil or bedrock characteristics, and <br /> any evidence of contamination will be noted. All water-bearing zones and the depths at <br /> which they were encountered will be noted on these logs (Appendix B). <br /> All borings will be drilled in such a manner as to prevent cross contamination between <br /> strata. Exploratory soil borings within the unsaturated zone will be backfilled with cement <br /> and three percent (3%) Bentonite mixture. <br /> Borings into the saturated zone will be drilled to a maximum of twenty feet (20') beneath <br /> the top of the aquifer being explored. Any perching layers encountered will be investigated <br /> to a maximum thickness of five feet (5') and will be backfilled with concrete slurry, after a <br /> Bentonite seal has been placed. If a deeper aquifer is to be investigated, conductor casings <br /> will first be grouted into place to seal off the upper aquifer(s), in series, if necessary, and <br /> drilling will proceed through the conductor casing after the grout has been allowed to set <br /> properly. If evidence of contamination is noted during the drilling, the drilling will be halted <br /> until the responsible professional determined the advisability of deeper drilling. <br /> Upon termination, the boring into the saturated zone will be completed as a monitoring well <br /> and backfilled with concrete grout, after a Bentonite seal has been placed. The boring for <br /> the monitoring well will be of a diameter at least four inches (4") greater than the two inch <br /> (2") diameter of the well casing to be used. <br /> The cuttings from the drilling operation will be containerized on-site during drilling for <br /> proper disposition. The proper method of disposal will be dependent upon results of <br /> laboratory analysis. This disposal will be the responsibility of the client unless other <br /> arrangements have been made. <br /> 3.2 Well Construction <br /> All materials used in well construction will be thoroughly cleaned prior to introduction into <br /> the boring. A Bentonite or cement and Bentonite grout will be placed at the bottom of the <br /> boring as necessary. After the seal has been allowed to set long enough to support the <br /> weight of the casing, a two inch (2") diameter well casing (stainless steal or PVC) with end <br /> cap and factory perforations for placement in the saturated zone (taking into account <br /> seasonal variation) will be placed in the boring. The screen and filter pack sizes will be as <br /> noted in the well construction drawing. The casing and end caps will be threaded or joined <br /> by stainless steel screws; no PVC cement will be used. The filter pack will extend two feet <br /> (2') above the perforated zone. A Bentonite seal two to three feet (2-3') thick will be <br />