a
<br /> • SITE HISTORY
<br /> BOYETT PETROLEUM
<br /> 419 S.Main Street
<br /> Manteca,California
<br /> On November 20 and 21, 1996, soil sampling was conducted at the site by WHF, Inc., (WHF) under the
<br /> direction of Mr. Robert McClellon of the San Joaquin County Public Health Service, Environmental
<br /> Health Division (SJCEHD). According to WHF, on November 20, 1996, one soil sample was collected
<br /> from beneath each of the site's three existing fuel dispensers at a depth of approximately two feet below
<br /> the dispenser piping. On November 21, 1996, four discrete soil samples were collected to characterize
<br /> approximately 44 cubic yards of material stockpiled at the site. The four discrete samples were
<br /> composited into two soil samples for laboratory analyses. The soil samples collected from both the
<br /> dispenser locations and the soil stockpile were analyzed for total petroleum hydrocarbons quantified as
<br /> gasoline (TPH-G) by EPA method 8015M, and for benzene, ethyl benzene, toluene, total xylenes
<br /> (BTEX), and methyl tert-butyl ether(MTBE)by EPA Method 8020.
<br /> On October 5, 1998, WHF, in conjunction with Fisch Environmental Exploration Services, completed
<br /> two vertical soil borings, SB-1 and SB-2, to a maximum depth of 18 feet below ground surface (bgs)
<br /> proximal to the fuel dispenser island. Soil samples were collected at five-foot intervals for soil
<br /> classification. Three soil samples were collected from each boring at depth intervals of 4-6 feet, 9-11 feet,
<br /> and 16 feet. One groundwater sample was collected from each boring from a depth of 18 feet for
<br /> laboratory analyses.
<br /> . On August 27 and 30, 1999,WHF,in conjunction with Frontier Drilling, completed four soil borings. The
<br /> borings, which varied in total depth from 26.5 to 36.5 feet bgs, were subsequently converted into monitor
<br /> wells MW-1 through MW-4; depth to groundwater was reported to be at approximately 18 feet bgs.
<br /> Laboratory analytical results of eleven soil samples collected from the borings/wells indicated no
<br /> detectable concentrations of petroleum hydrocarbons with the exception of MTBE, which was detected in
<br /> MW-1, MW-3, and MW-4 at concentrations up to 200 micrograms/kilogram (pg/kg). MTBE was
<br /> detected in groundwater samples collected from MW-1, MW-3, and MW4 at concentrations of 2,700
<br /> micrograms per liter(gg/L), 5,700 µg/L, and 140 gg/L, respectively. Tert-butanol (TBA) was detected in
<br /> the sample collected from MW-1 at a concentration of 98 µg/L, and tert-amyl methyl ether (TAME) was
<br /> detected in the samples collected from MW-1 and MW-3 at concentrations of 7.7 µg/L and 16 µgd,
<br /> respectively. Quarterly groundwater monitoring at the site began in the fourth quarter of 1999.
<br /> WHF prepared the Lateral Extent of Groundwater Contamination Work Plan, dated May 18, 2000,
<br /> describing proposed activities associated with the installation of four additional monitor wells intended to
<br /> define the lateral extent of groundwater contamination. At the request of the SJCEHD, WHF modified the
<br /> work plan to include use of cone penetration testing (CPT). The modified work plan was subsequently
<br /> approved by the SJCEHD on June 9, 2000.
<br /> On December 20-22, 2000, WHF, in conjunction with Frontier Drilling, completed four soil borings. The
<br /> borings, which varied in total depth between 20 and 25 feet bgs, were subsequently converted into
<br /> monitor wells MW-5 through MW-8; groundwater depth was measured at approximately 17 feet bgs.
<br /> According to a representative of the SJCEHD, aquarium sand purchased at a pet store was used in the
<br /> construction of MW-5. Soil samples were collected from each boring at five-foot intervals for soil
<br /> classification and three soil samples were collected from each boring at depth intervals of 16-16.5 feet,
<br /> 20-21.5 feet, and 26-26.5 feet for laboratory analyses. Laboratory analytical results of the twelve soil
<br />
|