Laserfiche WebLink
} <br /> Site History <br /> Boyett Petroleum(419 S.Main St.,Manteca) <br /> Page 5 of 5 <br /> In the First.Quarter Groundwater Monitoring Report, March 2003 Condor recommended the preparation <br /> of a problem assessment work plan (PAWP) to further investigate the lateral and vertical extent of <br /> groundwater contamination at the site; and the completion of a door-to-door survey of potential receptors <br /> within the residential area of the site to attempt to identify the presence of pumping wells in the site <br /> vicinity. <br /> On May 15, 2003, a meeting was held at the SJCEHD offices between Condor and SJCEHD <br /> representatives to discuss Condor's recommendations and address concerns the SJCEHD had regarding <br /> the site. In a letter dated May 29, 2003, the SJCEHD directed the submittal of two individual work plans <br /> to install, test, and operate an interim remediation system and to adequately define the lateral and vertical <br /> extent of the contamination plume at the site.The SJCEHD agreed with Condor's recommendations to(1) <br /> conduct a door-to-door survey of potential receptors, (2) redevelop MW-1, MW-2, MW-3, MW-6, MW- <br /> 7,MW-8, and MW-9, (3)destroy both damaged and consistently dry wells MW-4 and MW-5, and replace <br /> MW-4 with a new monitor well in the same area, and (5) conduct a monthly monitoring and sampling <br /> schedule over a consecutive six month period to characterize the fluctuation of MTBE concentrations in <br /> groundwater. In addition, the SJCEHD recommended that the design of MW-1 be reviewed within the <br /> context of a site conceptual model to determine if MW-1 potentially creates a vertical conduit between <br /> lithologic units and to submit a work pian for well replacement if appropriate. <br /> At the direction of the SJCEHD, Condor submitted an Additional Groundwater Investigation Work Plan, <br /> dated June 25, 2003, and an Interim Remediation Work Plan, dated June 25, 2003, to the SJCEHD and <br /> CRWQCB. The Additional Groundwater Investigation Work Plan was prepared to describe proposed <br /> groundwater investigation activities to evaluate the lateral and vertical extent of petroleum hydrocarbon <br /> contamination in groundwater up-gradient and down-gradient of the UST area using direct push boring <br /> methods. The Interim Remediation Work Plan addresses the installation of a pump and treat system for <br /> interim remediation, and the destruction of MW-4 and MW-5 and the installation of a replacement <br /> monitor well for MW4. <br /> PA3761 Boyett Manteca13761 Boyett Manteca\QMPsUune 20031Boyett Manteca Site History.doc <br />