Laserfiche WebLink
• SITE HISTORY <br /> BOYETT PETROLEUM <br /> 419 S. Main Street <br /> Manteca, California <br /> On November 20 and 21, 1996, soil sampling was conducted at the site by WHF, Inc., (WHF) under the <br /> direction of Mr. Robert McClellon of the San Joaquin County Public Health Service, Environmental <br /> Health Division(SJCEHD). According to WHF, on November 20, 1996, one soil sample was collected <br /> from beneath each of the site's three existing fuel dispensers at a depth of approximately two feet below <br /> the dispenser piping. On November 21, 1996, four discrete soil samples were collected to characterize <br /> approximately 44 cubic yards of miaterial stockpiled at the site. The four discrete samples were <br /> composited into two soil samples for laboratory analyses. The soil samples collected from both the <br /> dispenser locations and the soil stockpile were analyzed for total petroleum hydrocarbons quantified as <br /> gasoline (TPH-G) by EPA method 8015M, and for benzene, ethyl benzene, toluene, total xylenes <br /> (BTEX), and methyl tert-butyl ether(MTBE)by EPA Method 8020. <br /> On October 5, 1998, WHF, in conjunction with Fisch Environmental Exploration Services, completed <br /> two vertical soil borings, SB-1 and SB-2, to a maximum depth of 18 feet below ground surface (bgs) <br /> proximal to the fuel dispenser island. Soil samples were collected at 5-foot intervals for soil classification. <br /> Three soil samples were collected from each boring at depth intervals of 4-6 feet, 9-11 feet, and 16 feet. <br /> One groundwater sample was collected from each boring from a depth of 18 feet for laboratory analyses. <br /> On August 27 and 30, 1999, WHF, in conjunction with Frontier Drilling, completed four soil borings. The <br /> • borings, which varied in total depth between 26.5 and 36.5 feet bgs, were subsequently converted into <br /> monitor wells MW-1 through MW-4; depth to groundwater was reported to be at approximately 18 feet <br /> bgs. Laboratory analytical results of eleven soil samples collected from the borings/wells indicated no } <br /> detectable levels of petroleum hydrocarbons with the exception of MTBE, which was detected in MW-1, <br /> MW-3, and MW-4 at concentrations up to 200 micrograms/kilogram (p.g/kg). MTBE was detected in <br /> groundwater samples collected from MW-1, MW-3, and MW-4 at concentrations of 2,700 micrograms <br /> per liter (gg/L), 5,700 µg/L, and 140 µg/L, respectively. Tert-butanol (TBA) was reported in MW-1 at a <br /> concentration of 98 pg/L. Tert-amyl methyl ether (TAME) was reported in MW-1 and MW-3 at <br /> concentrations of 7.7 ug/L and 16 pg/L, respectively. Quarterly groundwater monitoring at the site began <br /> in the fourth quarter of 1999. <br /> WHF prepared the Lateral Extent of Groundwater Contamination Work Plan, dated May 18, 2000, <br /> describing proposed activities associated with the installation of four additional monitor wells intended to <br /> define the lateral extent of groundwater contamination. At the request of the SJCEHD, WHF modified the <br /> work plan to include use of cone penetration testing (CPT). The modified work plan was subsequently <br /> approved by the SJCEHD on June 9, 2000. <br /> On December 20-22, 2000, WHF, in conjunction with Frontier Drilling, completed four soil borings. The <br /> borings, which varied in total depth between 20 and 25 feet bgs, were subsequently converted into <br /> monitor wells MW-5 through MW-8; groundwater depth was measured at approximately 17 feet bgs. Soil <br /> samples were collected from each boring at five-foot intervals for soil classification and three soil <br /> samples were collected from each boring at depth intervals of 16-16.5 feet, 20-21.5 feet, and 26-26.5 feet <br /> for laboratory analyses. Laboratory analytical results of the twelve soil samples indicated petroleum <br /> • hydrocarbons were not detected at or above the laboratory reported detection limits. <br />