Laserfiche WebLink
r r <br /> SITE HISTORY <br /> BOYETT PETROLEUM <br /> 419 S. Main Street <br /> Manteca, California <br /> On November 20 and 21, 1996, soil sampling was conducted at the site by WHF, Inc., (WHF) under the <br /> direction of Mr. Robert McClellon of the San Joaquin County Public Health Service, Environmental <br /> Health Division (SJCEHD). According to WHF, on November 20, 1996, one soil sample was collected <br /> from beneath each of the site's three existing fuel dispensers at a depth of approximately two feet below <br /> the dispenser piping. On November 21, 1996, four discrete soil samples were collected to characterize <br /> approximately 44 cubic yards of soil from demolition and retrofit activities stockpiled at the site. The four <br /> discrete samples were composited into two soil samples for laboratory analyses. The soil samples <br /> collected from both the dispenser locations and the soil stockpile were analyzed for total petroleum <br /> hydrocarbons quantified as gasoline (TPH-G) by EPA method 8015M, and for benzene, ethyl benzene, <br /> toluene, total xylenes (BTEX), and methyl tent-butyl ether (MTBE)by EPA Method 8020. <br /> On October 5, 1998, WHF, in conjunction with Fisch Environmental Exploration Services, completed <br /> two vertical soil borings, SB-1 and'SB-2, to a maximum depth of 18 feet below ground surface (bgs) <br /> proximal to the fuel dispenser island. Soil samples were collected at five-foot intervals for soil <br /> classification.Three soil samples were collected from each boring at depth intervals of 4-6 feet, 9-11 feet, <br /> and 16 feet. One groundwater sample was collected from each boring from a depth of 18 feet for <br /> laboratory analyses. <br /> On August 27 and 30, 1999, WHF, in conjunction with Frontier Drilling, completed four soil borings. The <br /> borings, which varied in total depth from 26.5 to 36.5 feet bgs, were subsequently converted into monitor <br /> wells MW-1 through MW-4; depth to groundwater was reported to be at approximately I8 feet bgs. <br /> Laboratory analytical results of eleven soil samples collected from the borings indicated no detectable <br /> concentrations of petroleum hydrocarbons with the exception of MTBE, which was detected in soil <br /> samples from the borings for MW-1, MW-3, and MW-4 at concentrations up to 200 micrograms/kilogram <br /> (µg/kg). MTBE was detected in groundwater samples collected from MW-1, MW-3, and MW-4 at <br /> concentrations of 2,700 micrograms per liter(}tg/L), 5,700 µg/l,, and 140 gg/L, respectively. Tert-butanol <br /> (TBA) was detected in the sample collected from MW-1 at a concentration of 98 µg/L, and tert-amyl <br /> methyl ether (TAME) was detected in the samples collected from MW-1 and MW-3 at concentrations of <br /> 7.7 �Lg/L and 16 µg/L, respectively. Quarterly groundwater monitoring at the site began in the fourth <br /> quarter of 1999. <br /> WHF prepared the Lateral Extent of Groundwater Contamination Work Plan, dated May 18, 2000, <br /> describing proposed activities associated with the installation of four additional monitor wells intended to <br /> define the lateral extent of groundwater contamination. At the request of the SJCEHD, WHF modified the <br /> work plan to include use of cone penetration testing (CPT). The modified work plan was subsequently <br /> approved by the SJCEHD on June 9, 2000. <br /> From December 20 through 22, 2000, WHF, in conjunction with Frontier Drilling, completed four soil <br /> borings. The borings,. which varied in total depth from approximately 20 to 25 feet bgs, were <br /> siibsenlently ronvwrtt-0 into monitor well- MW-5 through MW-8: Eroundwater death was measured at <br /> approximately 17 feet bgs. According to a representative of the SJCEHD, aquarium sand purchased at a <br /> pet store was used in the construction of MW-5. Soil samples were collected from each boring at five-foot <br />