My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004459
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
3500 - Local Oversight Program
>
PR0545347
>
ARCHIVED REPORTS_XR0004459
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 4:53:41 PM
Creation date
2/6/2020 3:56:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004459
RECORD_ID
PR0545347
PE
3528
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
02
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHF Inc., Environmental & Engineering Group <br />' Health & Safety tY Plan <br /> 1.D Health and Safety Plan <br /> WHF, Inc., Environmental & Engineering Group has adopted the following health and safety <br /> procedures for working with organic vapors and liquid contaminants encountered during <br /> drilling and excavation of subsurface soil. The purpose of this program is to provide health <br /> and safety precautions for the initial and subsequent site visits until the nature and magnitude <br />' of the contaminants have been defined. <br /> 1.1 Personnel Responsihilfties <br />' <br /> All personnel assigned or involved with the remedial investigation or site clean-ups will <br /> have an assigned responsibility. The outlined responsibilities will establish standards <br /> for personnel protective wear, safety procedures and provide for emergency actions <br /> which could arise during project operations. <br /> 1.2 Project Manager (P41) <br />' The Project Manager directs all project operations. Project Manager (PM), in <br /> cooperation with the Project Safety Officer (PSO), has the primary responsibility for <br /> ensuring that the safety plan is read, signed, and fully understood by all employees and <br />' outside persons allowed around or within designated working perimeters of the job site. <br /> In cooperation with the PSO, he is responsible for ensuring that at all times during <br /> project operations, all employees adhere strictly to the Health and Safety Plan. <br />' 1.3 Project Sc{fety Officer (PSO) <br /> The PSO shall direct and ensure that all employees comply with the Health and Safety <br /> Plan. The PSO has the primary responsibility for: <br /> 1. Assuring that appropriate personnel protective equipment is available and <br /> tsivrvii) uuaicw vy cul via uity yviiviaia�.l. <br /> . 2. Assuring that personnel are aware of the provisions of this plan, are instructed <br />' in the work practices necessary to ensure safety, and in planned procedures for <br /> dealing with emergencies. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.