My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004460
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
3500 - Local Oversight Program
>
PR0545347
>
ARCHIVED REPORTS_XR0004460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 4:45:17 PM
Creation date
2/6/2020 3:57:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004460
RECORD_ID
PR0545347
PE
3528
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
02
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHF, Inc., Environmental& Engineering Group <br /> Health & Safety Plan <br /> Page: 7 <br /> ■ <br /> ' Step 7 Proceed to decontamination trailer to wash hands, face, and neck if on <br /> break or shower at the end of the shift. <br /> ' Step 8 At end of shift, wash respirator thoroughly in wash solution, germicidal <br /> rinse, clean rinse, and hang to dry. <br /> ' 4.2 Equipment Decontamination <br /> All equipment must be thoroughly washed, rinsed, and certified decontaminated before <br /> leaving the site. A decontamination station consisting of a vinyl catch basin and waste <br /> collection system shall be established in the contamination reduction zone. All visible <br /> contamination dust and residue shall be removed from all equipment. <br /> 4.3 Personnel Decontamination Station Closure <br /> All disposable clothing and plastic sheeting used during the operation will be double <br /> bagged and either containerized on-site if determined non-hazardous or removed to an <br /> approved disposal facility if hazardous. Reusable rubber clothing will be dried and <br /> prepared for future use (if gross contamination has occurred, additional <br /> decontamination may be required). Cloth items will be bagged and removed from the <br /> site for final cleaning. All wash tubs, pail containers, etc., will be thoroughly washed, <br /> rinsed, and dried prior to removal from the site. <br /> ■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />
The URL can be used to link to this page
Your browser does not support the video tag.