Laserfiche WebLink
21 <br /> It is anticipated that approximately four borings would be constructed to ground water on <br /> the western portion of the parcel in the vicinity of B4. Soil and ground-water samples would <br /> be collected for selected metals and organic constituents to define the source of <br /> contamination and to further evaluate site mitigation requirements. <br /> © SJHDORFF & SCALMANINI <br /> NU 1. TING ENGINIFF R9 <br />