My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINDSAY
>
302
>
2900 - Site Mitigation Program
>
PR0505929
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 7:18:39 PM
Creation date
2/6/2020 4:34:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505929
PE
2960
FACILITY_ID
FA0003985
FACILITY_NAME
BANNER ISLAND
STREET_NUMBER
302
Direction
W
STREET_NAME
LINDSAY
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
302 W LINDSAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT: NORTH PARCEL Log of Boring TR-1 <br /> Stockton, California PAGE 1 OF 1 <br /> Boring location: See Figure 2, Site Plan NOTES: Logged by P. Cusack <br /> Date started: 10/7/96 1 Date finished: 10/7/96 <br /> Drilling method: 8-inch O.D. hollow-stem auger <br /> Hammer weight: 140 Ibs. I Drop: 30 inches <br /> Sampler: California modified split spoon <br /> SAMPLES <br /> a 0 Zo_ m a $ 0 <br /> LU <br /> ¢ E o o ° MATERIAL DESCRIPTION <br /> v ro E m <br /> S U U7 <br /> C <br /> 1 SILTY SAND with CLAY (SM) <br /> dark brown, with wood, glass, roots, no odor <br /> 2 18/ 1/3.0 2 9 <br /> 3 18 SM FILL <br /> 4- <br /> 5- <br /> 6- 18/ <br /> 56 18/ 2/7.0 1.4 6 SANDY SILT (ML) <br /> 7 18 gray-green, moist,wood pieces, no odor <br /> $ ML <br /> 9- <br /> 10- <br /> 11— <br /> 1011 Bottom of boring terminated at a depth of 10 feet. <br /> Groundwater was not encountered. <br /> 12 Boring backfilled with cement grout. <br /> 13- <br /> 14- <br /> 15- <br /> 16- <br /> 17- <br /> 18- <br /> 19- <br /> 20- <br /> 21- <br /> 22- <br /> 23- <br /> 24- <br /> 25- <br /> 26- <br /> 27- <br /> 31415161718192021222324252627 ATTORNEY - CLIENT <br /> 28WORK PRIDO1CT <br /> 29 PRIVILEGED & (. ,,011)LNTIAL <br /> 30 <br /> neadwdUZ0110 Project No.2001.02 Figure 3a <br />
The URL can be used to link to this page
Your browser does not support the video tag.