Laserfiche WebLink
lda <br /> PROJECT: NORTH PARCEL Log of Boring TR-3 <br /> Stockton, California PAGE 1 OF 1 <br /> Boring location: See Figure 2, Site Plan <br /> NOTES: Logged by P. Cusack <br /> Date started: 10/7/96 1 Date finished: 10/7/96 <br /> Drilling method: 8-inch O.D. hollow-stem auger <br /> Hammer weight: 140 lbs. I Drop: 30 inches <br /> Sampler: California modified split spoon <br /> SAMPLES <br /> ~ > > oiu m m o O <br /> O a O <br /> o ¢ a a° o v W 3 J MATERIAL DESCRIPTION <br /> w E ¢ U) o F- <br /> 1. <br /> U N <br /> U N m J <br /> C � <br /> _ C <br /> SW SILTY SAND with GRAVEL (SW) <br /> 1 brown, loose, dry <br /> 2 18/ 1/3.0 0 11 SILTY SAND with CLAY (SM) <br /> 3 18 SM dark brown, moist,with wood, glass, and brick fragments, no odor FILL <br /> 4- <br /> 5- <br /> 6— <br /> 56 18/ 2/7.0 1 5 SILTY SAND with CLAY (SM/C) <br /> 7 15 gray, fine, moist, no odor <br /> SM <br /> 8 SC <br /> 9- <br /> 10- <br /> 11— <br /> 1011 Bottom of boring terminated at a depth of 10 feet. <br /> Groundwater was not encountered. <br /> 12 Boring backfilled with cement grout. <br /> 13- <br /> 14- <br /> 15- <br /> 16- <br /> 17- <br /> 18- <br /> 19- <br /> 20- <br /> 21- <br /> 22- <br /> 23- <br /> 24- <br /> 25- <br /> 26- <br /> 27— <br /> 31415161718192021222324252627 ATTORNEY - CLIENT <br /> 28WORK PROOXf <br /> 29 PRIVILI GL.h <<< ,. ,;v ii)) NTIAL <br /> 30 <br /> TreadwelEMollo Project No.2001.02 Figure 3c <br />