Laserfiche WebLink
PROJECT: NORTH PARCEL Log of Boring TR-5 <br /> Stockton, California PAGE 1 OF 1 <br /> Boring location: See Figure 2,Site Plan <br /> NOTES: Logged by P. Cusack <br /> Date started: 10/7/96 1 Date finished: 10/7/96 <br /> Drilling method: 8-inch O.D. hollow-stem auger <br /> Hammer weight: 140 lbs. I Drop: 30 inches <br /> Sampler: California modified split spoon <br /> SAMPLES <br /> F <br /> ID > p Z aai �' y p OJ <br /> W .� O �' m y nii <br /> O <br /> o L E E o¢ N o MATERIAL DESCRIPTION <br /> C L E m J <br /> U N <br /> C <br /> SILTY SAND with GRAVEL (SW) <br /> 1 brown, dry, loose <br /> 2 18/ 1/3.0 0 13 SILTY SAND (SW) <br /> 3 18 dark brown, loose, moist, with wood, glass, brick, and metal <br /> 4 <br /> SM fragments FILL <br /> 5- <br /> 6— 18/ 2/7.0 0 13 <br /> 7 18 SILTY SAND with CLAY (SM/SC) <br /> 8 SM gray,fine, moist, no odor <br /> 9 SC <br /> 10 <br /> Bottom of boring terminated at a depth of 10 feet. <br /> 11 Groundwater was not encountered. <br /> 12 Boring backfilled with cement grout. <br /> 13- <br /> 14- <br /> 15- <br /> 16- <br /> 17- <br /> 18- <br /> 19- <br /> 20- <br /> 21- <br /> 22- <br /> 23- <br /> 24- <br /> 25- <br /> 26- <br /> 27- <br /> 31415161718192021222324252627 ATTORNEY • CLIENT <br /> 28WORK PRODUCT <br /> 29PRIVILEGED $ (;., t !!)f.NTIAL <br /> 30 <br /> TfeadMffl11& 110 Project No.2001.02 Figure 3e <br />