Laserfiche WebLink
PROJECT: NORTH PARCEL Log of Boring TR-7 <br /> Stockton, California PAGE 1 OF 1 <br /> Boring location: See Figure 2, Site Plan <br /> NOTES: Logged by P. Cusack <br /> Date started: 10/14/96 1 Date finished: 10/14/96 <br /> Drilling method: 8-inch O.D. hollow-stem auger <br /> Hammer weight: 140 lbs. I Drop: 30 inches <br /> Sampler: California modified split spoon <br /> SAMPLES <br /> z�d no n ° O <br /> 'o 3 = MATERIAL DESCRIPTION <br /> ¢ U) _o H <br /> U N W tl m J <br /> C U <br /> C <br /> 1 SILTY SAND with GRAVEL (SM) <br /> dark brown, moist,with wood, glass, and roots, no odor <br /> 2 18/ 1/3.0 0 17 <br /> 3 18 SM FILL <br /> 4- <br /> 5- <br /> 6— <br /> 56 18/ 2/7.0 0 6 <br /> 17 SILTY SAND with CLAY (SM/SC) <br /> 7— SM gray, fine, moist, no odor <br /> 8 SC <br /> 9- <br /> 10— Bottom of boring terminated at a depth of 9 feet. <br /> Groundwater was not encountered. <br /> 11 Boring backfilled with cement grout. <br /> 12 <br /> 13 <br /> 14 <br /> 15 <br /> 16 <br /> 17 <br /> 18 <br /> 19 <br /> 20 <br /> 21 <br /> 22 <br /> 23 <br /> 24 <br /> 25 <br /> 26 <br /> 27— ATTORNEY - CLIENT <br /> 28 WORK PRODUCT <br /> 2s PRIVILEGED & �<44 II)I NTIAL <br /> 30 <br /> TmadweIE 80110 Project No.2001.02 Figure 3g <br />