Laserfiche WebLink
PROJECT: NORTH PARCEL Log of Moring TR-12 <br /> Stockton, California PAGE 1 OF 1 <br /> Boring location: See Figure 2,Site Plan NOTES: Logged by P. Cusack <br /> Date started: 10/14/96 Date finished: 10/14/96 <br /> Drilling method: 8-inch O.D. hollow-stem auger <br /> Hammer weight: 140 lbs. I Drop: 30 inches <br /> Sampler: California modified split spoon <br /> SAMPLES <br /> T- <br /> IL <br /> a w 0 z °� o <br /> LU o g .20 <br /> N f G a -- O <br /> t E o 0co E cc co o �_ MATERIAL DESCRIPTION <br /> C5 � m m J <br /> U (n <br /> C <br /> 1 SILTY SAND with GRAVEL (SW) <br /> brown, loose, dry <br /> 2 18i 1/3.0 1.1 16 becomes moist <br /> 3 18 SM with brick, glass, and wood fragments FILL <br /> 4- <br /> 5— <br /> SILTY <br /> 5SILTY SAND with CLAY (SM/SC) <br /> 6 18i 2/7.0 0 15 SM) brown, fine, moist <br /> 7 <br /> 16 <br /> Bottom of boring terminated at a depth of 7 feet. <br /> 8 Groundwater was not encountered. <br /> 9 Boring backfilled with cement grout. <br /> 10- <br /> 11- <br /> 12- <br /> 13- <br /> 14- <br /> 15- <br /> 16- <br /> 17- <br /> 18- <br /> 19- <br /> 20- <br /> 21- <br /> 22- <br /> 23- <br /> 24- <br /> 25- <br /> 26- <br /> 27- <br /> 01112131415161718192021222324252627 ATTORNEY - CLIENT <br /> 28WORK PRODUCT <br /> 29 PRIVILEGED <br /> 30 <br /> TmadwdEJ10Uo Project No.2001.02 Figure 31 <br />