My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KLO
>
146
>
2900 - Site Mitigation Program
>
PR0517686
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 6:25:38 PM
Creation date
2/6/2020 4:49:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0517686
PE
2960
FACILITY_ID
FA0013549
FACILITY_NAME
CENTRAL VALLEY CONSTRUCTION INC
STREET_NUMBER
146
STREET_NAME
KLO
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
146 KLO RD
P_LOCATION
07
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approximately 30 feet below grade at the approximate locations shown in Figure 4. <br /> Continuous soil samples will be taken. Permits for the Soil Probe will be requested from San <br /> Joaquin County. <br /> All soil samples will be field checked with a Photoionization Detector [PID] which measures <br /> organic vapors. All soil samples in excess of background levels will be analyzed. <br /> Soil samples will be analyzed for TPHD . <br /> Soil samples collected in the butyrate liner will be preserved by covering both ends with plastic <br /> caps. Soil samples will be labeled and logged under Chain-of- Custody (COC) control. Soil <br /> samples will be stored in a cooler with ice, transported to a state certified laboratory for <br /> analysis with COC documentation. <br /> A maximum of 25 soil samples is anticipated to be collected and analyzed in this task. <br /> Task 6 <br /> A well receptor survey will be conducted within a 2,000 foot radius of the site and shall <br /> provide recorded well construction. The well construction data will be presented in a Table. <br /> The well's location will be identified on a map. <br /> Task 7 <br /> A report will be prepared to document the results of the investigation and the laboratory <br /> analyses of the samples. The report will include a summary of the field work, boring logs, <br /> COC documentation, certified analytical results, conclusions and recommendations. <br /> The results of all soil and groundwater sampling relating to the UST and AST investigation <br /> will be presented in Tables. Detection limits will be shown. <br /> Site maps will be to scale and show the location of the former UST and AST, current UST, <br /> buried pipes and utilities, if any, septic system and leach fields, if any, all above ground <br /> structures including utility lines, as well as nearby land marks such as rivers, and potentially <br /> sensitive receptors. <br /> The report will include a complete geologic description of the site subsurface lithology. <br /> Properly labeled cross-sections will be included. A standard explanation will be included with <br /> the cross-sections that defines all units, abbreviations and symbols used, as well as the <br /> horizontal and vertical scales used to create the dra%A-ings. <br /> Two copies of the report will be submitted to the client . <br /> 4 <br />