Laserfiche WebLink
3.0 PROJECT WORK PLAN <br /> 3.1 Purpose of Site Work <br /> Drill and sample two (2) soil borings, each to an approximate 15-foot total depth. <br /> 3.2 Description of Job Tasks <br /> On-site tasks in order of execution: <br /> 1) Perform utility clearance. <br /> *2) Hand auger to 5 feet depth at each boring location. <br /> *3) Drill, sample and grout soil borings. <br /> *Tasks to be performed by subcontractor(s) under McLaren/Hart supervision. <br /> Are any off-site tasks planned? No <br /> Describe: NA <br /> 33 Utility Clearance <br /> • To be performed by: McLaren/Hart and U.S.A. <br /> • Date to be performed: July 13, 1992 and prior to drilling. <br /> • The Utilities Clearance Checklist Form (Attachment 2) must be completed and <br /> returned to the Regional Environmental Health and Safety Manager. <br /> • Map identifying utilities (Attachment 3) must be completed and returned to the <br /> Regional Environmental Health and Safety Manager. <br /> 10 <br />