Laserfiche WebLink
MONITORING AND REPORTING Pt,-,TRAM NO. R5-2004-XXXX -4- <br /> DEFENSE DISTRIBUTION DEPOT SAN JOAQUIN <br /> SHARPE WASTEWATER TREATMENT FACILITY <br /> SAN JOAQUIN COUNTY <br /> SOLID WASTE AND SLUDGE MONITORING <br /> A log shall be kept of solid waste(grits and screenings) and sludge quantities generated and of <br /> handling and disposal activities, and shall be submitted as part of the monthly monitoring reports <br /> REPORTING <br /> In reporting monitoring data, the Discharger shall arrange the data in tabular form so that the date, <br /> sample type(e.g., effluent, pond, etc.), and reported analytical result for each sample are readily <br /> discernible. The data shall be summarized in such a manner to clearly illustrate compliance with waste <br /> discharge requirements and spatial or temporal trends, as applicable. The results of any monitoring <br /> done more frequently than required at the locations specified in the Monitoring and Reporting Program <br /> shall be reported in the next scheduled monitoring report. <br /> As required by the California Business and Professions Code Sections 6735, 7835, and 7835.1, all <br /> Groundwater Monitoring Reports shall be prepared under the direct supervision of a Registered <br /> Engineer or Geologist and signed by the registered professional. <br /> A. Monthly Monitoring Reports <br /> Daily,weekly, and monthly monitoring data shall be reported in monthly monitoring reports. <br /> Monthly reports shall be submitted to the Regional Board on the 1"day of the second month <br /> following sampling (i.e. the January Report is due by 1 March). At a minimum, the reports shall <br /> include: <br /> 1. Results of influent, effluent, and pond monitoring; <br /> 2. A comparison of monitoring data to the discharge specifications and an explanation of any <br /> violation of those requirements. Data shall be presented in tabular format; <br /> 3. If requested by staff, copies of laboratory analytical report(s); and <br /> 4. A calibration log verifying calibration of all hand-held monitoring instruments and devices used <br /> to comply with the prescribed monitoring program. <br /> B. Quarterly Monitoring Reports <br /> The Discharger shall establish a quarterly sampling schedule for groundwater monitoring such that <br /> samples are obtained approximately every three months. Quarterly monitoring reports shall be <br /> submitted to the Regional Board by the 1st day of the second month after the quarter(i.e. the <br /> January-March quarterly report is due by May 1s) and may be combined with the monthly report or <br /> with the quarterly monitoring report submitted under the Federal Facilities Agreement (FFA). The <br /> Quarterly Report shall include the following: <br /> JSK 3/41003 <br />