My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AMERICAN
>
446
>
2900 - Site Mitigation Program
>
PR0543884
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 10:55:02 AM
Creation date
2/10/2020 9:14:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543884
PE
2959
FACILITY_ID
FA0024952
FACILITY_NAME
GLEASON PARK APARTMENTS
STREET_NUMBER
446
Direction
S
STREET_NAME
AMERICAN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14926216
CURRENT_STATUS
02
SITE_LOCATION
446 S AMERICAN ST
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 <br /> Health and Safety Plan and Soil Management Plan <br /> Gleason Park Apartments Property <br /> April 21,2010 <br /> HEALTH AND SAFETY PLAN (HSP) <br /> GENERAL <br /> A low-level hazard exists for exposure of lead-containing soils at the site during future <br /> construction and maintenance work. Although risk assessment has demonstrated that the risk is <br /> not unacceptable, it is considered prudent to implement basic health and safety measures at the <br /> site to limit exposure to lead-containing soils. Potential exposure routes are den-nal contact, <br /> inhalation, and incidental ingestion. <br /> The measures described herein are limited to procedures to minimize exposure to residual lead in <br /> site soils. All other health and safety measures, such as those to address common physical and <br /> construction hazards, are the responsibility of future contractors/workers and other site personnel <br /> and are not included in the scope of this plan. <br /> SAFE WORK PRACTICES <br /> During any activities at the site that engages/disturbs site soils, practical measures should be <br /> implemented to reduce exposure via dermal contact, inhalation, and incidental ingestion of soils. <br /> Safe work practices to be employed during future construction and maintenance work that <br /> engages soil at the subject site are as follows: <br /> • Any workers whose activities may engage soils at the subject site should be notified of the <br /> residual lead conditions and the safe work practices described herein. Workers should read <br /> and understand this document. It is the responsibility of the property owners or managers <br /> to provide this document to workers and to provide assistance in understanding the <br /> infonnation presented in this document (such as translation for non-English speaking <br /> individuals). <br /> • Dust control measures should be implemented to limit or prevent airborne soil particles <br /> during activities that involve soil disturbance. An effective dust control measure is the <br /> wetting of exposed soils to limit airborne soil particles. Wetting can be accomplished via <br /> liberal sprinkling of exposed soils with a garden hose or other suitable means. <br /> Additionally, areas of exposed loose soil could be covered if necessary to prevent wind <br /> disturbance. The actual methods used for dust control will depend on the nature of the <br /> soil disturbance activity, the size of the area disturbed, soil moisture content, and weather <br /> conditions. As a general rule, measures should be implemented so that no visible dust is <br /> generated during site activities. <br /> • Whereas dennal contact with site soils is not prohibited, such contact should be <br /> minimized to the extent practical considering the nature of site activity. Measures to <br /> minimize dermal contact include wearing gloves, long pants, and long-sleeved shirts <br /> during work that involves significant contact with site soils. All personnel in contact <br /> with site soils should wash their hands, face, neck, and anus at the end of the work day. <br />
The URL can be used to link to this page
Your browser does not support the video tag.