PART II. SPECIFIC PERMIT CONDITIONS <br /> Prior to each demonstration required in the following sections A through C, the <br /> Permittee shall submit plans for procedures and specifications to the U.S. <br /> Environmental Protection Agency Region IX Ground Water Office ("EPA") for <br /> discussion and approval. The submittal address is provided in Section D, paragraph 5. <br /> No demonstration in these sections may proceed without prior written approval from <br /> EPA. The Permittee shall submit results of each demonstration required in this section <br /> to EPA within sixty (60) days of completion. <br /> A. WELL CONSTRUCTION <br /> 1. Requirement for Prior Written Permission to Drill, Test, Construct, or Operate <br /> (a) Financial Assurance <br /> The Permittee shall supply evidence of financial assurance prior to <br /> commencing Injection Well Drilling and Construction, in accordance with <br /> Section F of this part. <br /> (b) Pre-notification <br /> After approval for any of the approved field. demonstrations is provided, <br /> notification to EPA at least 30 days prior to performing the demonstration is <br /> required, to allow EPA to arrange to witness if so elected. <br /> 2. Locations of Injection Wells CSC-1 and CSC-2 <br /> Injection wells authorized under this permit will be located near the California <br /> Specialty Cheeses property on South Airport Way northeast of Lathrop, California. <br /> The proposed general location for Wells CSC-1 and CSC-2 is found in Appendix A, <br /> Figures 1-3. <br /> (a) Prior to drilling any well, the Permittee must submit proposed field <br /> coordinates (Section, Township, Range, with latitude/longitude) for that <br /> specific well; for the second well, also provide the distance between the two <br /> wells, along with any justification for the separation distance. <br /> (b) After drilling is completed, the Permittee must submit final field coordinates <br /> (Section, Township, Range, with latitude/longitude) of any well constructed <br /> under this permit with the Final Well Construction Report required under <br /> paragraph 12 of this section. If final well coordinates differ from the <br /> proposed coordinates submitted under paragraph (a), justification and <br /> UIC Permit CA10500002 <br /> Page 5 of 29 <br />