My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
14253
>
2900 - Site Mitigation Program
>
PR0543397
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 11:21:23 AM
Creation date
2/10/2020 9:37:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543397
PE
2965
FACILITY_ID
FA0012215
FACILITY_NAME
RCCI PTP
STREET_NUMBER
14253
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
19803031
CURRENT_STATUS
01
SITE_LOCATION
14253 S AIRPORT WAY
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and the Permittee must demonstrate that each well has mechanical integrity, in <br /> accordance with Section C paragraphs 1(a) and 2 of this part, before any injection is <br /> authorized. <br /> 10. Confining Layer <br /> Field information on the confining layer (either the Miocene or Cretaceous <br /> Confining Layer), such as its characteristics, its thickness and its local structure will <br /> be obtained during drilling of the injection wells and and shall be included in the <br /> Final Well Construction Report required in paragraph 12 of this section. <br /> 11. Monitoring Devices <br /> The Permittee shall install and maintain in good operating condition: <br /> (a) A tap on the discharge line between the injection pump and the wellhead for <br /> the purpose of obtaining representative samples of injection fluids; and <br /> (b) Devices to continuously measure and record injection pressure, annulus <br /> pressure, flow rate, and injection volumes, subject to the following: <br /> (i) Pressure gauges shall be of a design to provide: <br /> (1) A full pressure range of 100 percent greater than the <br /> anticipated operating pressure; and <br /> (2) A certified deviation accuracy of five (5) percent or less <br /> throughout the operating pressure range. <br /> (ii) Flow meters shall measure cumulative volumes and be certified for a <br /> deviation accuracy of five (5) percent or less throughout the range of <br /> injection rates allowed by the permit. <br /> 12. Final Well Construction Report and Completion of Construction Notice <br /> (a) The Permittee must submit a final well construction report, including <br /> logging, coring, and other results, with a schematic diagram and detailed <br /> description of construction, including driller's log, materials used (i.e., tubing <br /> tally), and cement (and other) volumes, to EPA within sixty (60) days after <br /> completion of either Injection Well CSC-1 or CSC-2. <br /> (b) The Permittee must also submit a notice of completion of construction to <br /> EPA (see EPA Form 7520-9 in Appendix C). Injection operations may not <br /> commence until EPA has inspected or otherwise reviewed the injection wells <br /> UIC Permit CA10500002 <br /> Page 10 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.