Laserfiche WebLink
(f) Types of analyses; and <br /> (g) Results of analyses. <br /> 3. Monitoring Devices <br /> (a) Continuous monitoring devices <br /> Temperature, annular pressure, and injection pressure shall be measured at <br /> the wellhead using equipment of sufficient sensitivity and accuracy. <br /> Injection rate shall be measured in the supply line immediately before the <br /> wellhead. The Permittee shall continuously monitor and record the following <br /> parameters: <br /> Monitoring Parameter Frequency Instrument <br /> injection rate (gallons per minute) Continuous digital recorder <br /> injection total volume (gallons) Continuous digital totalizer <br /> injection pressure sig) Continuous digital recorder <br /> annular pressure ( si ) Continuous digital recorder <br /> injection fluid temperature Continuous digital recorder <br /> (degrees Fahrenheit) <br /> (b) Injection Fluid Monitoring. <br /> Injection fluids will be analyzed to yield representative data on their physical, <br /> chemical, and other relevant characteristics.The Permittee shall take samples <br /> at or before the wellhead for analysis. The results of the tests shall be <br /> submitted to EPA on a quarterly basis. <br /> (c) Calibration and Maintenance of Equipment <br /> All monitoring and recording equipment shall be calibrated and maintained <br /> on a regular basis to ensure proper working order of all equipment. <br /> 4. Recordkeeping <br /> The Permittee shall retain the following records: <br /> (a) All monitoring information, including required observations, calibration and <br /> maintenance records, recordings for continuous monitoring instrumentation, <br /> copies of all reports required by this permit, and records of all data used to <br /> complete the permit application; and <br /> UIC Permit CAI 0500002 <br /> Page 18 of 29 <br />