My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
14253
>
2900 - Site Mitigation Program
>
PR0543397
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 11:21:23 AM
Creation date
2/10/2020 9:37:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543397
PE
2965
FACILITY_ID
FA0012215
FACILITY_NAME
RCCI PTP
STREET_NUMBER
14253
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
19803031
CURRENT_STATUS
01
SITE_LOCATION
14253 S AIRPORT WAY
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(b) Where actual plugging differed from the Plugging and Abandonment Plans, a <br /> statement specifying the different procedures followed. <br /> F. FINANCIAL RESPONSIBILITY <br /> 1. Demonstration of Financial Responsibility_ <br /> The Permittee is required to demonstrate and maintain financial responsibility and <br /> resources sufficient to close, plug, and abandon the underground injection operation <br /> as provided in the Plugging and Abandonment Plans and consistent with 40 CFR <br /> §144 Subpart D, which the Director has chosen to apply. <br /> (a) The Permittee shall post a financial instrument such as a surety bond with a <br /> standby trust agreement or arrange other financial assurance for each well <br /> constructed in the amount of $180,000, to guarantee closure. Authority to <br /> drill and construct any well will not be given until the financial instrument <br /> has been posted and approved by EPA. <br /> (b) The financial responsibility mechanism shall be reviewed and updated <br /> periodically, upon request of EPA. The permittee may be required to change <br /> to an alternate method of demonstrating financial responsibility which names <br /> EPA as the beneficiary. Any such change must be approved in writing by <br /> EPA prior to the change. <br /> 2. Insolvency of Financial Institution <br /> The Permittee must submit an alternate instrument of financial responsibility <br /> acceptable to EPA within sixty (60) days after either of the following events occurs: <br /> (a) The institution issuing the bond or financial instrument files for bankruptcy; <br /> or <br /> (b) The authority of the trustee institution to act as trustee, or the authority of the <br /> institution issuing the financial instrument, is suspended or revoked. <br /> Failure to submit an acceptable financial demonstration will result in the termination <br /> of this permit pursuant to 40 CFR§144.40(a)(1). <br /> 3. Insolvency of Owner or Operator <br /> An owner or operator must notify EPA by certified mail of the commencement of <br /> voluntary or involuntary proceedings under U.S. Code Title 11 (Bankruptcy), <br /> UIC Permit CA 10500002 <br /> Page 22 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.