Laserfiche WebLink
8. Inspection and Entry <br /> The Permittee shall allow EPA, or an authorized representative, upon the <br /> presentation of credentials and other documents as may be required by law, to: <br /> (a) Enter upon the Permittee's premises where a regulated facility or activity is <br /> located or conducted, or where records are kept under the conditions of this <br /> permit; <br /> (b) Have access to and copy, at reasonable times, any records that are kept under <br /> the conditions of this permit; <br /> (c) Inspect and photograph at reasonable times any facilities, equipment <br /> (including monitoring and control equipment), practices, or operations <br /> regulated or required under this permit; and <br /> (d) Sample or monitor at reasonable times, for the purposes of assuring permit <br /> compliance or as otherwise authorized by the SDWA, any substances or <br /> parameters at any location. <br /> 9. Signatory Requirements <br /> All applications, reports, or other information submitted to EPA shall be signed and <br /> certified .by a responsible corporate officer or duly authorized representative <br /> according to 40 CFR §§122.22 and 144.32. <br /> 10. Additional Reporting <br /> (a) Planned Changes — The Permittee shall give notice to EPA as soon as <br /> possible of any planned physical alterations or additions to the permitted <br /> facility. <br /> (b) Anticipated Noncompliance - The Permittee shall give advance notice to <br /> EPA of any planned changes in the permitted facility or activity which may <br /> result in noncompliance with permit requirements. <br /> (c) Compliance Schedules - Reports of compliance or noncompliance with, or <br /> any progress reports on, interim and final requirements contained in any <br /> compliance schedule of this permit shall be submitted to EPA no later than <br /> thirty (30) days following each schedule date. <br /> UIC Permit CAI 0500002 <br /> Page 27 of 29 <br />