Laserfiche WebLink
Proposed Cretaceous 2nd Tracy Injection Well <br /> 24" conductor cemented at 40' <br /> 40' <br /> �— 13-3/8", 48#, H-40 STC casing <br /> cemented at 650' <br /> 650' <br /> — 8-5/8", 32#, J-55 ST&S casing <br /> cemented at 5,245' <br /> i <br /> i <br /> ;.t-- 12-1/4" hole <br /> 4-1/2", 12.75#, EUE, J-55 tubing <br /> .---- 8-5/8" Baker Model D packer at 5,100' <br /> i <br /> i <br /> Liner packer <br /> i <br /> Lower extension <br /> Blank 5-1/2", 15.5#, J-55 LT&C <br /> i <br /> Top of Top of gravel pack <br /> Cretaceous 2nd Tracy Sand t=-- Cement in the annulus <br /> 5,235' 5,245' 8-5/8" casing at 5,245' <br /> - -� 5-112" Bakerweld gravel pack screen <br /> �`--7-718" hole under-reamed to 15" <br /> - <br /> Total Depth 5,500' <br /> October 2005 Figure 22 <br /> Note: All depths and equipment descriptions TODD ENGINEERS Proposed <br /> are approximate. Emeryville, California Cretaceous Injection <br /> Well Design <br />